Question & Answer
Questions and clarifications about the project
1. No subject Nov 12 2024 at 2:46 PM
- Anonymous Nov 12 2024 at 2:46 PMUser information is private
Can the engineer and electrician be subcontractors? - Nov 14 2024 at 4:08 PMCity of Richmond
Yes
2. No subject Nov 13 2024 at 8:40 PM
- Anonymous Nov 13 2024 at 8:40 PMUser information is private
Given Thanksgiving/the holidays, would the City consider extending the submission deadline? - Nov 21 2024 at 4:29 PMCity of Richmond
No
3. MBE Score Nov 14 2024 at 9:54 AM
- Nov 14 2024 at 9:54 AMCity of Richmond
How will firms be scored for MBE participation with the RFP having a 0% goal? - Nov 14 2024 at 9:55 AMCity of Richmond
All proposals will receive the full 30 evaluation points from OMBD.
4. No subject Nov 14 2024 at 4:02 PM
- Anonymous Nov 14 2024 at 4:02 PMUser information is private
Is prevailing wage required for this contract? - Nov 21 2024 at 4:29 PMCity of Richmond
No
5. No subject Nov 14 2024 at 4:03 PM
- Anonymous Nov 14 2024 at 4:03 PMUser information is private
Can the City please provide the site layout(s)? - Nov 21 2024 at 4:29 PMCity of Richmond
That is not available as the projects will be on an "as needed" basis throughout the City.
6. No subject Nov 14 2024 at 4:03 PM
- Anonymous Nov 14 2024 at 4:03 PMUser information is private
Are dual or single port L2s requested? - Nov 21 2024 at 4:29 PMCity of Richmond
Please refer to the updated pricing sheet.
7. No subject Nov 15 2024 at 8:07 AM
- Anonymous Nov 15 2024 at 8:07 AMUser information is private
Will the City approve payment on stored equipment? - Nov 21 2024 at 4:29 PMCity of Richmond
No
8. No subject Nov 15 2024 at 8:11 AM
- Anonymous Nov 15 2024 at 8:11 AMUser information is private
Does the City currently have an EV Infrastructure for Charging Stations already installed? - Nov 21 2024 at 4:29 PMCity of Richmond
No
9. No subject Nov 18 2024 at 7:25 PM
- Anonymous Nov 18 2024 at 7:25 PMUser information is private
Does the City have charger requirements? (such as: kW ranges, pedestals vs wall mounts, and charger port type and count) - Nov 21 2024 at 4:29 PMCity of Richmond
It will be site specific, please refer to the Technical Requirements attached to this RFP
10. No subject Nov 18 2024 at 7:25 PM
- Anonymous Nov 18 2024 at 7:25 PMUser information is private
Does the city have a term requirement for the charger warranties? (2, 3, 5 year etc) - Nov 21 2024 at 4:29 PMCity of Richmond
Minimum 3 year warranty, the City looks favorably on longer warranties.
11. No subject Nov 18 2024 at 7:25 PM
- Anonymous Nov 18 2024 at 7:25 PMUser information is private
Are we to assume all 78 chargers in one location? - Nov 21 2024 at 4:29 PMCity of Richmond
No, the need for chargers is throughout the City. Please note that the number listed is an estimate only.
12. No subject Nov 18 2024 at 7:26 PM
- Anonymous Nov 18 2024 at 7:26 PMUser information is private
Is there a new utility service required? - Nov 21 2024 at 4:29 PMCity of Richmond
That will be site dependent
13. No subject Nov 18 2024 at 7:26 PM
- Anonymous Nov 18 2024 at 7:26 PMUser information is private
Can we edit or include a new tab with a more thorough BOM and assumptions/exclusions? - Nov 21 2024 at 4:29 PMCity of Richmond
Please include that information in Tab 3: Project Approach
14. No subject Nov 19 2024 at 1:01 PM
- Anonymous Nov 19 2024 at 1:01 PMUser information is private
Can you please clarify the response given to Question #3 MBE Score; the City stated 'All proposals will receive the full 30 evaluation points from OMBD'. Does this mean we don't have to complete the MBE forms? - Nov 20 2024 at 3:20 PMCity of Richmond
Please note that bidders for this project are not required to complete our forms to receive the 30 points.
15. Budget Nov 19 2024 at 2:23 PM
- Anonymous Nov 19 2024 at 2:23 PMUser information is private
what is the budget for this project? - Nov 20 2024 at 2:48 PMCity of Richmond
That information is not available
16. EV_Chargers_Pricing_Sheet Clarification Nov 19 2024 at 4:16 PM
- Anonymous Nov 19 2024 at 4:16 PMUser information is private
While the RFP indicates a desire for both single and dual port L2 offerings, the pricing sheet only has one line item for "Level 2 Charger", quantity 78. Can you please confirm if this is for 78 single or dual port chargers? - Nov 20 2024 at 2:48 PMCity of Richmond
Please see updated pricing sheet.
17. EV_Technical_Requirements Clarification Nov 19 2024 at 4:17 PM
- Anonymous Nov 19 2024 at 4:17 PMUser information is private
Section 4.1.1-4.1.3 refer to chargers for public use. Often there are different charging solutions that are tailored for fleet only versus those that are for mixed or public use. However, there is only one row on the Pricing Sheet to list the price so we must assume one type or the other. Does the City prefer a fleet only solution to be priced or a more expensive offer that can support fleet and public? Alternatively, we could list the fleet unit pricing in row 3 of the pricing sheet and place the alternative mixed use/public charging unit in the unscored/optional section. - Nov 21 2024 at 4:29 PMCity of Richmond
Please refer to section 1.3.1. Please include other options offered by your firm as well as pricing for those items in Tab 9.
18. EV_Technical_Requirements; 1.0.18 Nov 19 2024 at 4:17 PM
- Anonymous Nov 19 2024 at 4:17 PMUser information is private
1.0.18 lists a current requirement of 80 A but a minimum of 12kW power output which would only require ~50 A (@240V). Perhaps this was intended to represent 80 A to a dual port charger to enable 12kW per port? Regardless it can be confusing if the City is looking for both single and dual port solution. If the City intends a minimum specification of 12kW, can you please revise to read as ""EVSE shall meet the following specifications: 50 A, 208-240V ac, 60 Hz, single-phase (two-pole) services per charger, minimum output of 12 kw per port."? - Nov 21 2024 at 4:29 PMCity of Richmond
Please see updated EV Charger Technical Requirements
19. Electric Vehicle Chargers Nov 20 2024 at 4:26 PM
- Anonymous Nov 20 2024 at 4:26 PMUser information is private
These were the questions we are needing more guidance on: • Is NovaCharge providing turnkey install quote? • Will the stations be installed in the same area or multiple locations on the property • Is the intention to install new EV panel from existing main or utility transformer? • If utility transformer, has this been located or will it be new from the utility provider? • 120/208V onsite or 480V? • Is there a plan for future growth when sizing the service? • Is full power required or can the stations be power shared or installed with VCT to keep infrastructure costs down? • Is there a preliminary design to work from or are they looking for design guidance as well? • I see a note for DCFC.. how many, what size? • What is the fleet? What is the use case? What are the charging times and range needed? • Pedestal or wall mount? - Nov 21 2024 at 4:29 PMCity of Richmond
No Please see answer to question #11 Site dependent Site dependent Site dependent Site dependent The City aims to reduce greenhouse gas emissions. To that end, the project may expand Site dependent Design and guidance will occur prior to project installation Fast chargers are desired by the City, however their installation is subject to availability of funds The City's electric fleet consists of light duty vehicles charging will be overnight to accommodate demand Site dependent
20. No subject Nov 21 2024 at 5:41 PM
- Anonymous Nov 21 2024 at 5:41 PMUser information is private
Can we add more line items to the “un-scored Pricing section” in attachment K? - Nov 26 2024 at 2:30 PMCity of Richmond
Do not add lines to the the excel pricing sheet. Detail any additional costs, items, services, etc. in Tab 9 or 10. Please refer to section 1.4.10 and 1.4.11
21. No subject Nov 21 2024 at 5:41 PM
- Anonymous Nov 21 2024 at 5:41 PMUser information is private
To confirm, the requirement under “1.4.13. Tab 12: Security Capabilities and Compliance” to provide PCI and PA-DSS compliance letters will only be applicable to the optional public chargers? - Nov 26 2024 at 2:30 PMCity of Richmond
It is applicable to all chargers
22. No subject Nov 21 2024 at 5:42 PM
- Anonymous Nov 21 2024 at 5:42 PMUser information is private
Do you have any defined specs for the L3/DC fast chargers? - Nov 26 2024 at 2:30 PMCity of Richmond
Level 3 chargers are very much desired by the City however, specifications have not been contemplated. Offerors are encouraged to provide innovative solutions that provide value to the City and specifications that are tailored for municipal fleets.
23. No subject Nov 21 2024 at 5:43 PM
- Anonymous Nov 21 2024 at 5:43 PMUser information is private
Will the "mobile application" section only be evaluated for the public charging station offerings? - Nov 26 2024 at 2:30 PMCity of Richmond
Yes
24. No subject Nov 21 2024 at 5:43 PM
- Anonymous Nov 21 2024 at 5:43 PMUser information is private
Do you have desired specs for the optional public stations? - Nov 26 2024 at 2:30 PMCity of Richmond
Public facing capability is very much desired by the City however, specifications have not been contemplated. Offerors are encouraged to provide innovative solutions that provide value to the City.
25. ChargePoint response to EV_Technical_Requirements - Mobile Q&A Nov 22 2024 at 10:00 AM
- Anonymous Nov 22 2024 at 10:00 AMUser information is private
In regards to the technical specifications specifically the Mobile App questions - 7.0.28 to 7.0.33, could City of Richmond please provide clarification if these questions are applicable as the questions are structured toward purchasing a mobile app. The questions being are asked are administrative interface and ability to integrate and customize the mobile app-- ours is a purely consumer mobile app so many of these questions don't apply. Could you also please let us know of the use case for the mobile app questions? - Nov 26 2024 at 2:30 PMCity of Richmond
Section 7.0.1 through 7.0.33 (Mobile application) is optional and applicable only to public charging option should an offeror's proposal contain such.
26. Installation Services Nov 22 2024 at 11:16 AM
- Anonymous Nov 22 2024 at 11:16 AMUser information is private
does site preparation encompass any of the following: breaking concrete, trenching, laying out conduits, pulling wires to charger location, and painting? We are seeking clarification on exactly what the City requires in installation. - Nov 26 2024 at 2:30 PMCity of Richmond
That is ultimately site dependent, however the City anticipates some locations/installations may require what is described in the question.
27. Qualified Provider Nov 22 2024 at 11:52 AM
- Anonymous Nov 22 2024 at 11:52 AMUser information is private
Section 1.3.1 stated that "the City requires a qualified provider of EV Level 2 EV chargers...." Can you please elaborate who are the "qualified providers" and what is the procedure to get qualified. - Nov 26 2024 at 2:30 PMCity of Richmond
This refers to offerors on this RFP. Qualification is determined through evaluation of proposals.
28. No subject Nov 22 2024 at 3:38 PM
- Anonymous Nov 22 2024 at 3:38 PMUser information is private
Is "CITY OF RICHMOND - GOODS AND SERVICES CONTRACT", which is Attachment E to the RFP, required to be submitted with the Response to RFQ. If yes, what should we write as "Contract Number", what will be the "Commencement Date" etc. Will it be attached as part of Tab 1? - Nov 26 2024 at 2:30 PMCity of Richmond
Attachment E is an example only and does not need to be submitted.
29. No subject Nov 22 2024 at 3:52 PM
- Anonymous Nov 22 2024 at 3:52 PMUser information is private
Section 1.3.3 mentions "Contractor shall notify the City in writing of all planned hardware and software upgrades and carryout these upgrades only after receiving written approval from the City". Is this a mandatory condition or can this be negotiated with the City upon award. - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to 2.5.5. Negotiation with Offerors regarding negotiation.
30. No subject Nov 22 2024 at 3:53 PM
- Anonymous Nov 22 2024 at 3:53 PMUser information is private
Is there a sample agreement that will be provided for review to vendors participating in the RFP? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to attachment E
31. No subject Nov 22 2024 at 3:53 PM
- Anonymous Nov 22 2024 at 3:53 PMUser information is private
Section 1.4.1 mentions a full proposal to be uploaded in Word and PDF. Are these to be uploaded under the same tab of the "Vendor Questionnaire" as No. 5 of the questionnaire mentions only PDF upload? - Nov 26 2024 at 2:30 PMCity of Richmond
PDF only is fine, section 1.4.1 has been updated.
32. No subject Nov 22 2024 at 3:53 PM
- Anonymous Nov 22 2024 at 3:53 PMUser information is private
Is this RFP purely for fleet of the city or does the city intend to have a mix utility by having public facing chargers. Does the City have any intended number of chargers that needs to have public and fleet usage? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to section 1.3.1 regarding public use of chargers.
33. No subject Nov 22 2024 at 3:54 PM
- Anonymous Nov 22 2024 at 3:54 PMUser information is private
Does the pricing sheet need to reflect chargers purely for fleet or public or both? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to section 1.3.1 regarding public use of chargers.
34. No subject Nov 22 2024 at 3:54 PM
- Anonymous Nov 22 2024 at 3:54 PMUser information is private
Section 1.4.8. Tab 7: Commitment to Environmental Justice and Sustainability mentions that the City requires a comprehensive plan for public access of chargers by underserved communities. Does the City have a set number of chargers and their locations for public use? - Nov 26 2024 at 2:30 PMCity of Richmond
Offerors are asked to submit their commitment to environment justice which could include how their proposal would benefit underserved communities. Tab 7 has been updated accordingly. Refer to section 1.3.1 for information regarding public use.
35. No subject Nov 22 2024 at 3:56 PM
- Anonymous Nov 22 2024 at 3:56 PMUser information is private
If there are public facing chargers' part of the first two-year contract term? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to section 1.3.1 of the RFP
36. No subject Nov 22 2024 at 3:56 PM
- Anonymous Nov 22 2024 at 3:56 PMUser information is private
Can the City share locations of the chargers intended to be public, fleet, and/or both? - Nov 26 2024 at 2:30 PMCity of Richmond
That information is not available
37. No subject Nov 22 2024 at 3:56 PM
- Anonymous Nov 22 2024 at 3:56 PMUser information is private
The pricing sheet shared in Addendum 1 has no line item for preventive maintenance while the RFP mentions adding preventive maintenance pricing in the proposal. Can the City clarify if vendors can add line items in the pricing sheet? - Nov 26 2024 at 2:30 PMCity of Richmond
Do not add lines to the the excel pricing sheet. Detail any additional costs, items, services, etc. in Tab 9 or 10. Please refer to section 1.4.10 and 1.4.11
38. No subject Nov 22 2024 at 3:57 PM
- Anonymous Nov 22 2024 at 3:57 PMUser information is private
The RFP documents mentions adding extended warranty in the pricing, however, the pricing sheet has extended warranty under the unscored section which does not need pricing. Can the City clarify if the extended warranty cost has to be added in the scored section? If yes, can we add a line item for extended warranty? - Nov 26 2024 at 2:30 PMCity of Richmond
The City recognizes that extended warranties may vary from offeror to offeror and in order to score the costs fairly, the City has decided to not score the cost of the extended warranty.
39. No subject Nov 22 2024 at 3:57 PM
- Anonymous Nov 22 2024 at 3:57 PMUser information is private
The RFP documents mentions adding extended warranty in the pricing, however, the pricing sheet has extended warranty under the unscored section which does not need pricing. Can the City clarify if the extended warranty cost has to be added in the scored section? If yes, can we add a line item for extended warranty? - Nov 26 2024 at 2:30 PMCity of Richmond
The excel pricing sheet lists what items will factor in the cost score as well as unscored items and services that the City would like as part of the agreement. Detail any additional costs, items, services, etc. in Tab 9 or 10. Please refer to section 1.4.10 and 1.4.11
40. No subject Nov 22 2024 at 3:58 PM
- Anonymous Nov 22 2024 at 3:58 PMUser information is private
Can the City share the timeline for purchase and installation of the chargers for the first 2 year contract period. - Nov 26 2024 at 2:30 PMCity of Richmond
That information is not available
41. No subject Nov 22 2024 at 3:59 PM
- Anonymous Nov 22 2024 at 3:59 PMUser information is private
Under which Tab should the proposal have the Transmittal Letter? - Nov 26 2024 at 2:30 PMCity of Richmond
Tab 1
42. No subject Nov 22 2024 at 3:59 PM
- Anonymous Nov 22 2024 at 3:59 PMUser information is private
Can the city provide minimum number of chargers that will be purchased in first phase ? - Nov 26 2024 at 2:30 PMCity of Richmond
That information is not available
43. No subject Nov 22 2024 at 4:00 PM
- Anonymous Nov 22 2024 at 4:00 PMUser information is private
Will the City select multiple vendors for this scope in RFP or a single vendor will be selected? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to section 2.6.1 of the RFP
44. No subject Nov 22 2024 at 4:00 PM
- Anonymous Nov 22 2024 at 4:00 PMUser information is private
Is Credit Card a requirement for the chargers? - Nov 26 2024 at 2:30 PMCity of Richmond
No
45. No subject Nov 22 2024 at 4:01 PM
- Anonymous Nov 22 2024 at 4:01 PMUser information is private
What is the desired kW output for the DCFC chargers? - Nov 26 2024 at 2:30 PMCity of Richmond
Fast chargers are very much desired by the City however, specifications have not been contemplated. Offerors are encouraged to provide innovative solutions that provide value to the City and specifications that are tailored for municipal fleets.
46. No subject Nov 22 2024 at 4:02 PM
- Anonymous Nov 22 2024 at 4:02 PMUser information is private
Must all units be BAA (Buy American) compliant? - Nov 26 2024 at 2:30 PMCity of Richmond
No
47. No subject Nov 22 2024 at 4:03 PM
- Anonymous Nov 22 2024 at 4:03 PMUser information is private
The pricing sheet has no item line for accessories. Can we add item line as required? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to section 1.4.10. Tab 9: Optional Products and Services
48. No subject Nov 22 2024 at 4:03 PM
- Anonymous Nov 22 2024 at 4:03 PMUser information is private
Please clarify what is the scope of vegetation removal in the price sheet. Is this service required at the time and where chargers are installed or is this part of maintenance services offered? - Nov 26 2024 at 2:30 PMCity of Richmond
It is site dependent. The City anticipates that in the future, vegetation removal may be necessary for EV Charger installation and would like for offerors to describe how that is costed.
49. No subject Nov 22 2024 at 4:04 PM
- Anonymous Nov 22 2024 at 4:04 PMUser information is private
The Technical Requirement mentions windows authentication for the application. Is this a hard requirement or are other authentication services integrated acceptable? - Nov 26 2024 at 2:30 PMCity of Richmond
Note that section 7.0.20 under mobile application is optional
50. No subject Nov 22 2024 at 4:04 PM
- Anonymous Nov 22 2024 at 4:04 PMUser information is private
Point 7.0.30 - Mobile application section of the technical requirements mentions "Application shall respond to any end-user requests within 4 seconds". Could the City clarify the scope for this requirement? - Nov 26 2024 at 2:30 PMCity of Richmond
Note that section 7.0.30 under mobile application is optional. The 4 seconds refers to processing time for user commands.
51. No subject Nov 22 2024 at 4:05 PM
- Anonymous Nov 22 2024 at 4:05 PMUser information is private
Does the City intend to purchase the Hardware, Software, and Services and have a host owned model or is the City assessing other business models? - Nov 26 2024 at 2:30 PMCity of Richmond
Offerors are encouraged to provide innovative, turnkey solutions that provide best value to the City.
52. No subject Nov 22 2024 at 4:05 PM
- Anonymous Nov 22 2024 at 4:05 PMUser information is private
Could the City provide minimum number of experiences to be highlighted under Tab 4: Experience section? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to section 1.3.2 of the RFP
53. No subject Nov 22 2024 at 4:05 PM
- Anonymous Nov 22 2024 at 4:05 PMUser information is private
Is there a dedicated page limit per section/tab? - Nov 26 2024 at 2:30 PMCity of Richmond
There is no page limit for any section or tab
54. No subject Nov 22 2024 at 4:06 PM
- Anonymous Nov 22 2024 at 4:06 PMUser information is private
Is the City looking for complete PCI-DSS compliance letter or just a certificate? - Nov 26 2024 at 2:30 PMCity of Richmond
Note that section 7.0.1 through 7.0.33 under mobile application is optional
55. No subject Nov 22 2024 at 4:06 PM
- Anonymous Nov 22 2024 at 4:06 PMUser information is private
Do we need to add the Minority Business Development cover letter with the MBE form submission with the RFP response? - Nov 26 2024 at 2:30 PMCity of Richmond
No
56. No subject Nov 22 2024 at 4:07 PM
- Anonymous Nov 22 2024 at 4:07 PMUser information is private
The due date for the questions is 11/26, following which there are holidays and the final answers will be released in the week of bid submission. This leaves less than a week to go through the Q&A and submit the bid response. We request the City to extend the due date of submission by 10 business days after the full question list has been released? - Nov 26 2024 at 2:30 PMCity of Richmond
The due date will not be changed at this time.
57. Stored Equipment Question #7 Nov 23 2024 at 7:53 AM
- Anonymous Nov 23 2024 at 7:53 AMUser information is private
Would chargers be ordered at a release quantity of (1 or 2)? - Nov 26 2024 at 2:30 PMCity of Richmond
Charger orders will be site dependent.
58. No subject Nov 23 2024 at 8:15 AM
- Anonymous Nov 23 2024 at 8:15 AMUser information is private
Are monthly progress invoices (progress billing) acceptable? - Nov 26 2024 at 2:30 PMCity of Richmond
That would be on a case by case basis. Offerors should describe their billing structure in Tab 10 as part of their Cost and Pricing.
59. License requirement Nov 24 2024 at 2:55 AM
- Anonymous Nov 24 2024 at 2:55 AMUser information is private
Section 1.2.1 mentions "The person having overall responsibility for the project management and coordination of disciplines must be an Architect or Professional Engineer licensed by the Virginia Department of Professional and Occupational Regulation in accordance with requirements of the Code of Virginia." Is this a hard requirement or is the City open to negotiation? - Nov 26 2024 at 2:30 PMCity of Richmond
It is a requirement. Please refer to section 2.5.5. Negotiation with Offerors for information regarding negotiations.
60. No subject Nov 25 2024 at 8:23 AM
- Anonymous Nov 25 2024 at 8:23 AMUser information is private
For Tab 7: Commitment to Environmental Justice and Sustainability, the section requests a comprehensive plan on ensuring public EV charging stations are accessible to underserved communities. Is the City looking for an actual plan or capabilities to develop a plan in coordination with the City of Richmond? - Nov 26 2024 at 2:30 PMCity of Richmond
Offerors are asked to submit their commitment to environment justice which could include how their proposal would benefit underserved communities. Tab 7 has been updated accordingly.
61. No subject Nov 25 2024 at 8:23 AM
- Anonymous Nov 25 2024 at 8:23 AMUser information is private
For Tab 8: References, should we utilize the same contacts used in the Tab 4: Experience section or do we need to use different contacts? - Nov 26 2024 at 2:30 PMCity of Richmond
Experience refers to the history of the offeror and their projects, role, and involvement in the industry. References are project owners who the City can contact to get a fuller perspective of the offeror.
62. Continued question from #7 Nov 23 2024 at 8:08 AM
- Anonymous Nov 23 2024 at 8:08 AMUser information is private
Why would the city not pay for units ordered but not installed. This seems unreasonable as manufacturers expect payment in (30) days, some in (10) days. - Nov 26 2024 at 2:30 PMCity of Richmond
Orders for installation of EV Chargers are expected to be turnkey and treated as unique projects. Should the City desire to order additional units for their own storage, that would not include installation and would be treated like a regular transaction for goods.
63. No subject Nov 23 2024 at 8:13 AM
- Anonymous Nov 23 2024 at 8:13 AMUser information is private
The invoice could include documentation (serial number) pictures and insurance confirmation as we need to pay the manufacturer for units they shipped. Please comment - Nov 26 2024 at 2:30 PMCity of Richmond
Additional documentation is okay.
64. No subject Nov 25 2024 at 12:41 PM
- Anonymous Nov 25 2024 at 12:41 PMUser information is private
1.6.2. PREVENTIVE MAINTENANCE states that the Contractor shall provide a maintenance plan, to be described per the Additional Questions form. Where can we find this additional questions form? - Nov 26 2024 at 2:30 PMCity of Richmond
Section 1.3.4.2. Preventative Maintenance has been updated.
65. No subject Nov 25 2024 at 12:49 PM
- Anonymous Nov 25 2024 at 12:49 PMUser information is private
To confirm, we submit our entire proposal under "Offerors Response" which includes responses to tab 1-14. Then we need to also submit separate documents for each individual tab (tab 1-14)? - Nov 26 2024 at 2:30 PMCity of Richmond
Correct
66. No subject Nov 25 2024 at 12:50 PM
- Anonymous Nov 25 2024 at 12:50 PMUser information is private
To confirm, we must upload a word document and a pdf document for each submission? - Nov 26 2024 at 2:30 PMCity of Richmond
pdf only
67. Pricing Sheet Nov 25 2024 at 12:58 PM
- Anonymous Nov 25 2024 at 12:58 PMUser information is private
The excel pricing sheet not align with the instructions in Tab 10: Cost and Pricing. The RFP document advises to structure our pricing according to the 7 items (hardware & equipment, installation, preventative maintenance, etc.). However, the pricing sheet is different and doesn't include preventative maintenance, as-needed service, emergency services, and more. Can you please advise how to include the proposal requirements in the pricing sheet? - Nov 26 2024 at 2:30 PMCity of Richmond
The excel pricing sheet lists what items will factor in the cost score as well as unscored items and services that the City would like as part of the agreement. Detail any additional costs, items, services, etc. in Tab 9 or 10. Please refer to section 1.4.10 and 1.4.11
68. License requirement Nov 25 2024 at 3:24 PM
- Anonymous Nov 25 2024 at 3:24 PMUser information is private
Considering the license requirement for the project, does the prime contractor have to be the overall project manager or can a subcontractor holding the license be the overall project manager? - Nov 26 2024 at 2:30 PMCity of Richmond
A subcontractor holding the license can be the overall project manager
69. No subject Nov 25 2024 at 3:32 PM
- Anonymous Nov 25 2024 at 3:32 PMUser information is private
As we are required to provide a transparent pricing structure for the installation, maintenance, service, monitoring, software, and customer support - should we add these additional line items in attachment K to complete this requirement? - Nov 26 2024 at 2:30 PMCity of Richmond
Yes, address in detail in Tab 9 or 10, depending. Please refer to section 1.4.10 and 1.4.11
70. No subject Nov 25 2024 at 3:37 PM
- Anonymous Nov 25 2024 at 3:37 PMUser information is private
Tab 1 requires, amongst other forms, Addenda Acknowledgement. Where can we find the format of this Addenda Acknowledgement? - Nov 26 2024 at 2:30 PMCity of Richmond
Addenda acknowledgement is in section 5.1 RFP Vendor Questionnaire
71. Mobile Application - 7.0.1-7.0.33 Nov 25 2024 at 7:26 PM
- Anonymous Nov 25 2024 at 7:26 PMUser information is private
Mobile applications are only relevant for public charging models requiring payment. Given that the scope of this services is for L2s to serve city fleet vehicles - payment capabilities and a mobile application is not necessary. Please confirm that the mobile application section of the technical requirements is not applicable for this submission. - Nov 26 2024 at 2:30 PMCity of Richmond
Note that section 7.0.1 through 7.0.33 under mobile application is optional
72. Tech Specs Nov 25 2024 at 6:10 PM
- Anonymous Nov 25 2024 at 6:10 PMUser information is private
7.0.16 of the Tech Specs says: "The City shall have the option to adjust the behavior of application components to meet future business needs through direct manipulation of an explicit business process model, making design manageable by business users without the need for substantial IT support.". Please provide explanation as to what is required here - Nov 26 2024 at 2:30 PMCity of Richmond
Note that section 7.0.1 through 7.0.33 under mobile application is optional
73. Pricing Sheet Nov 26 2024 at 11:09 AM
- Anonymous Nov 26 2024 at 11:09 AMUser information is private
Can you please confirm what we are expected to quote for each charger line item in the price sheet. Should our prices for these line items include the charging equipment + 3-year warranty? - Nov 26 2024 at 2:30 PMCity of Richmond
Refer to section 1.3.1
74. No subject Nov 26 2024 at 10:56 AM
- Anonymous Nov 26 2024 at 10:56 AMUser information is private
Given the outstanding questions, holiday week, and the approaching due date - will the City of Richmond consider an extension to allow for more thorough proposals? - Nov 26 2024 at 2:30 PMCity of Richmond
There will be no extension at this time
75. EV Technical Requirements Sheet Nov 26 2024 at 10:54 AM
- Anonymous Nov 26 2024 at 10:54 AMUser information is private
How will the EV technical requirements sheet be evaluated? - Nov 26 2024 at 2:30 PMCity of Richmond
Please refer to section 1.5.
76. No subject Nov 26 2024 at 3:09 PM
- Anonymous Nov 26 2024 at 3:09 PMUser information is private
Is the requirement for "LAN Communications: Modbus" negotiable? Can the city also provide additional explanation regarding this requirement? " - Dec 4 2024 at 7:28 AMCity of Richmond
This requirements is standard for a City owned device. However, given this use case "LAN Communications: Modbus" is negotiable.
77. No subject Nov 26 2024 at 3:05 PM
- Anonymous Nov 26 2024 at 3:05 PMUser information is private
This costs for conduit, wire etc... is listed as an (EA). If listed as each, please provide an average length that can be used to determine costs structure (Suggested 100'). If not, suggested to utilize a LF. - Dec 4 2024 at 8:40 AMCity of Richmond
This has been updated on 21 November, 2024. Please refer to the updated files and addenda.
78. No subject Nov 26 2024 at 3:02 PM
- Anonymous Nov 26 2024 at 3:02 PMUser information is private
Is certified payroll required for this project(s)? - Dec 5 2024 at 3:19 PMCity of Richmond
no
79. No subject Nov 26 2024 at 3:02 PM
- Anonymous Nov 26 2024 at 3:02 PMUser information is private
Is prevailing wage required for this solicitation? - Dec 5 2024 at 2:54 PMCity of Richmond
see question 4
80. No subject Nov 26 2024 at 3:01 PM
- Anonymous Nov 26 2024 at 3:01 PMUser information is private
Panel Upgrades is a very vague description. This could vary in costs significantly. Is there any particular sized panel that has been discussed or looked at? - Dec 4 2024 at 7:28 AMCity of Richmond
There is not a particular sized panel and will be location specific.
81. No subject Nov 26 2024 at 3:01 PM
- Anonymous Nov 26 2024 at 3:01 PMUser information is private
It was not made clear in the solicitation on what is required from the gear. Are we assuming that the only need for electrical equipment/gear is a 100A Breaker and that breaker is to be inserted to existing gear? Or do we need to take into account a service disconnect near the EV chargers. - Dec 4 2024 at 7:34 AMCity of Richmond
As electrical gear is unscored and will not count toward the cost scoring. Please include if your firm provides them along with a brief description in Tab 3: Project Approach. Please describe how they are priced with examples and/or vignettes in Tab 10: Cost and Pricing. Per attachment K.
82. Optional Technical Requirements Nov 26 2024 at 4:09 PM
- Anonymous Nov 26 2024 at 4:09 PMUser information is private
The response to question #25 indicated that "Section 7.0.1 through 7.0.33 (Mobile application) is optional and applicable only to public charging option should an offeror's proposal contain such". However, as the spreadsheet didn't indicate this section was optional - can you please confirm is there are additional sections that are optional besides 3.0.1-3.2.5 and 7.0.1-7.0.33? - Nov 26 2024 at 4:14 PMCity of Richmond
The spreadsheet has been updated with addendum #3.
83. Clarification on Response Provided for Question 73 Nov 26 2024 at 4:28 PM
- Anonymous Nov 26 2024 at 4:28 PMUser information is private
The response advised us to refer to section 1.3.1. We understand that installation, minimum three (3) year warranty (parts and service), software with fault monitoring and networking, accessories, and ongoing maintenance should be provided for L2 chargers. Our question is whether the line item for each charger on the pricing sheet should include equipment + 3-year warranty. Please confirm whether the line items for each charger on the pricing sheet should lump together equipment and warranty. thank you - Dec 5 2024 at 3:20 PMCity of Richmond
It is expected that a minimum 3 year warranty is on the scored level 2 charger on the pricing sheet. Please refer to section 1.4.11. Tab 10: Cost and Pricing for un-scored items.