Mount Vernon Library Commons
Last updated by Addendum #5 on Aug 16, 2022 12:13 AMSee what changed
Request For Proposal
Public Works - Engineering
Project ID: 2022-RFP-013
Release Date: Friday, July 22, 2022
· Due Date: Thursday, August 18, 2022 2:00pm
Posted Friday, July 22, 2022 5:00am
All dates & times in Pacific Time
Question & Answer
Questions and clarifications about the project
1. Electronic Files Jul 22 2022 at 10:44 AM
- Anonymous Jul 22 2022 at 10:44 AMUser information is private
Can electronic drawing(CAD) files be provided to help assist us with our earthwork takeoff? - Jul 29 2022 at 5:01 PMCity of Mount Vernon
Please see Official Notice #3:
2. Subcontractors Jul 25 2022 at 9:43 AM
- Anonymous Jul 25 2022 at 9:43 AMUser information is private
Are you accepting scope specific bids at this time, or are you looking for full GC bids? - Jul 28 2022 at 3:13 PMCity of Mount Vernon
Per the Bid Form, Bidders shall provide one Base Bid and Bid Alternates. Scope-specific Bids will not be accepted.
3. Traffic Coating and Concrete finishes Jul 25 2022 at 12:31 PM
- Anonymous Jul 25 2022 at 12:31 PMUser information is private
What are the specification references for the coatings and finishes called out on Sheet A2.60? - Jul 28 2022 at 3:12 PMCity of Mount Vernon
Please see Specification Section 07 14 16 Cold Fluid-Applied Waterproofing
4. Access Control Jul 25 2022 at 1:28 PM
- Anonymous Jul 25 2022 at 1:28 PMUser information is private
Does the bidder for Access control need to be a johnson Controls VAR or a Software House VAR? - Jul 29 2022 at 2:02 PMCity of Mount Vernon
Software House is under Johnson Controls, so either one is acceptable.
5. Access Control Jul 25 2022 at 1:30 PM
- Anonymous Jul 25 2022 at 1:30 PMUser information is private
Is the Access Control a "Stand Alone" system or tied to a City Wide system? - Aug 11 2022 at 12:06 PMCity of Mount Vernon
Access Control shall be tied to City Wide System.
6. VMS Jul 25 2022 at 1:31 PM
- Anonymous Jul 25 2022 at 1:31 PMUser information is private
The specification does not call for a VMS (Video Management System), could the City provide clarification? - Aug 10 2022 at 5:48 PMCity of Mount Vernon
Exaqvision VMS is the City standard.
7. Buy America Jul 25 2022 at 3:20 PM
- Anonymous Jul 25 2022 at 3:20 PMUser information is private
Product substitution section 01 25 13 item 1.6F states substitution requests for products that don't meet Buy America requirements will be rejected. The product listed as the basis of design in the specification is not an American product. Does this project require Buy America products? - Jul 28 2022 at 3:13 PMCity of Mount Vernon
In order to respond to this question, additional clarification is needed. Please clearly indicate which specified basis-of-design product in which Specification is not an American product.
8. CPT Data Jul 25 2022 at 3:52 PM
- Anonymous Jul 25 2022 at 3:52 PMUser information is private
Could you please provide the raw data from the 4EA CPTs that were included in GeoEngineer's report? - Aug 1 2022 at 8:43 AMCity of Mount Vernon
Please see Official Notice #4.
9. Cameras Jul 26 2022 at 1:17 PM
- Anonymous Jul 26 2022 at 1:17 PMUser information is private
Would the City approve a subsitution on approve alternate manufacturers (Hanwha, Axis)? Both manufacturers are NDAA compliant - Jul 29 2022 at 5:03 PMCity of Mount Vernon
Please see Substitution Request Approvals in Addendum 1.
10. Insurance Requirements Jul 27 2022 at 10:07 AM
- Anonymous Jul 27 2022 at 10:07 AMUser information is private
The limit requirement for the General Liability coverage is worded a bit different then normal. It looks to be indicating that the contract is requiring GL limits be at $5M per occurrence and $10M aggregate without using your umbrella limit to obtain this limit. Please confirm limits from an unbrella policy can be used to meet the GL limits - Aug 5 2022 at 10:10 AMCity of Mount Vernon
The contractor can meet the Commercial General Liability insurance requirements through a combination of primary and umbrella or excess coverage.
11. Fabricator and Erector AISC Certification requirements Jul 28 2022 at 1:18 PM
- Anonymous Jul 28 2022 at 1:18 PMUser information is private
051200 requires that both the steel fabricator and erector be AISC certified. Can non-AISC certified firms be used if pre-approved by demonstrating similar work experience on past projects? - Jul 29 2022 at 8:35 AMCity of Mount Vernon
Yes.
12. PV Panels Jul 28 2022 at 1:14 PM
- Anonymous Jul 28 2022 at 1:14 PMUser information is private
Section 263100, 1.1.E.1. references the PV system as base bid. 012300 has it as alternate #8. Please clarify what part of the PV system is to be included as base bid. - Aug 2 2022 at 9:45 AMCity of Mount Vernon
Please carefully review the description of the Base Bid and Alternate in Section 01 23 00 and Section 26 31 00. The Alternate is a deductive Alternate. Note that the Alternate is Alternate #11 as indicated in Section 01 23 00 and not Alternate #8.
13. Mass Concrete Jul 28 2022 at 1:11 PM
- Anonymous Jul 28 2022 at 1:11 PMUser information is private
033000 Includes Mass Concrete requirements. No definition of where these apply are included. Please confirm that Mass Concrete requirements are only applicable at the Mat Footing (S2.21). - Jul 29 2022 at 8:35 AMCity of Mount Vernon
Yes, the mass concrete only applies to the mat foundation on S2.21.
14. Buy America/Buy American Jul 28 2022 at 12:49 PM
- Anonymous Jul 28 2022 at 12:49 PMUser information is private
The project documents reference both Buy American and Buy America. These requirements are not the same. Please clarify what the Contractor is required to adhere to. If Buy America is applicable please specify which agency's Buy America requirements will apply. - Aug 1 2022 at 4:15 PMCity of Mount Vernon
This question will be addressed via Addenda.
15. Allowances Jul 28 2022 at 10:38 AM
- Anonymous Jul 28 2022 at 10:38 AMUser information is private
Section 01 21 00 item 3.3 indicates a lump sum allowance for materials, receiving, handling and installation costs plus GC overhead and profit for view shelves and baffles . Does this provided allowance also include any miscellaneous attachments, bracing, engineering and secondary supports that may be required? - Aug 1 2022 at 4:15 PMCity of Mount Vernon
Yes.
16. Bid Day Time Jul 28 2022 at 10:36 AM
- Anonymous Jul 28 2022 at 10:36 AMUser information is private
Please consider pushing back the bid due time from 10am to 2pm. 10am is an early deadline for a project of this size and complexity. There are a lot of subcontractor quotes to process on bid day. An early bid due time makes that very difficult. - Aug 2 2022 at 9:45 AMCity of Mount Vernon
This question will be addressed via Addenda.
17. Testing and Inspections Jul 28 2022 at 8:46 AM
- Anonymous Jul 28 2022 at 8:46 AMUser information is private
007200 is requiring the contractor to provide for all testing and inspection. Does this include all special and independent inspections? For example, is the Contractor required to hire a geotechnical engineer to conduct the required geotechnical special inspections noted in 014343A, Table 1? - Aug 2 2022 at 9:45 AMCity of Mount Vernon
This question will be addressed via Addenda.
18. No subject Jul 28 2022 at 8:31 AM
- Anonymous Jul 28 2022 at 8:31 AMUser information is private
Please confirm that the gutter attached to the bottom row of the PV panels as shown on A4.21 is not required if the alternate for PV panels is not selected - Aug 4 2022 at 9:26 AMCity of Mount Vernon
The Photovoltaic System Alternate is a deductive Alternate. If Bid Alternate #11 for the Photovoltaic System is accepted, the snow guards, gutters, and downspouts are not to be installed. On the roof, the downspouts daylight and drain into the roof drains. Roof drains are part of the Base Bid. At the south elevation, the downspouts tightline into storm drain connections. The storm drain connections are part of the Base Bid and shall be capped at grade if the Alternate is accepted.
19. 05 52 30 - Vehicle Barrier System Jul 28 2022 at 3:04 PM
- Anonymous Jul 28 2022 at 3:04 PMUser information is private
Section 05 52 30, Paragraph 1.3, C states that the system shall be designed fabricated and installed by a single specialty company. Would it be acceptable to have the embeds and steel components fabricated by an experienced local shop and cable designed and installed by an additional experienced PT contractor? - Jul 29 2022 at 8:35 AMCity of Mount Vernon
Yes, the steel embeds and members such as steel HSS may be provided by a separate steel shop. The cables and their components such as cable anchorages shall be by the PT suppliers.
20. Signage Discrepency Jul 28 2022 at 3:14 PM
- Anonymous Jul 28 2022 at 3:14 PMUser information is private
Are the signage quantities to be taken from the Wayfinding and Building Signage Specs/Drawings (101423-1 and the plans following) OR the signage schedule from plan sheet A8.10? (The quantities vary quite a bit.) - Aug 8 2022 at 9:41 AMCity of Mount Vernon
Please see Addendum 2. Signage quantities have been rectified in the Signage Schedules (A8.10), Signage Plans, (A8.20 - A8.24), and Wayfinding and Building Signage Packet which follows Specification Section 10 14 23 in the Project Manual.
21. Buy America Jul 28 2022 at 3:49 PM
- Anonymous Jul 28 2022 at 3:49 PMUser information is private
My question was about manufacturers of terra cotta sun controls. There are three manufacturers listed, two of which are manufactured outside the US. The basis of design product has a sole representative in the U.S. but the product is manufactured in France. Another listed product is manufactured in Germany. The project may not require Buy America qualified products but the Product Substitution form states products not meeting Buy America requirements will be rejected. - Aug 1 2022 at 4:17 PMCity of Mount Vernon
Please refer to 01 60 00 2.1.F for exceptions to the Buy America requirements.
22. Specification 00 11 53 Supplemental Bidder Responsability Jul 28 2022 at 4:41 PM
- Anonymous Jul 28 2022 at 4:41 PMUser information is private
We are respectfully requesting the following modifications be made to supplemental bidder responsibility criteria in an effort to increase the amount of qualified local contractors to submit proposals for this project. The increased number of potential contractors will provide downward pressure on all the bids received, giving it a better chance of bringing the project in within the current budget. 1 – Require the contractor to have completed at least 2 projects over 30 million dollars in the past 5 years. Or 2 – Require the contractor to have completed at least 5 projects over 18,500,000 in the past 10 years. - Aug 1 2022 at 4:18 PMCity of Mount Vernon
This question will be addressed via Addenda.
23. Communication Cabling Alternates Jul 29 2022 at 8:45 AM
- Anonymous Jul 29 2022 at 8:45 AMUser information is private
Specification section: 27 15 00 Paragraphs: 2.1, C. Specification section allows Berk-Tek/Ortronics as an alternate to Panduit. The Ortronics premium warranty is now tied to Superior Essex cable rather than Berk-Tek. Is Superior Essex cable acceptable to the owner? - Aug 10 2022 at 5:04 PMCity of Mount Vernon
Yes, Superior Essex is acceptable.
24. Telecom Backbone Jul 29 2022 at 8:39 AM
- Anonymous Jul 29 2022 at 8:39 AMUser information is private
Specification section: 27 15 00 Paragraphs: 2.3 - 2.5 Specifications describe basic fiber and copper backbone, but there is no detail in the drawings showing a fiber and/or copper tie between the MDF and IDF. Is there a planned tie between these rooms? - Aug 10 2022 at 5:51 PMCity of Mount Vernon
Please see Sheet E6.01 issued via Addendum 2. This will be further addressed in Addendum 4.
25. Traffic Coating and Concrete Finishes Jul 29 2022 at 11:56 AM
- Anonymous Jul 29 2022 at 11:56 AMUser information is private
Per Sheet A2.60 "Sealer-6" is called out. Please list Spec section required for this designation. - Aug 10 2022 at 1:05 PMCity of Mount Vernon
Sealer-6 shall be the product specified as Water Repellent for Cast-in-Place Concrete and Post-Tensioned Concrete in Section 07 19 00 Water Repellents. See Addendum 3.
26. Emergency Egress Options Aug 1 2022 at 9:07 AM
- Anonymous Aug 1 2022 at 9:07 AMUser information is private
08.33.00 - Coiling Grille - Emergency Egress Options. Door 106F is too large for emergency egress as specified in the spec. It can have emergency chain hoist release. It would be possible to have as specified in the spec if basis of design was changed to the 670 aluminum grille as the weight would be less. Please confirm if emergency chain hoist release will suffice for Door 106F. - Aug 10 2022 at 9:10 AMCity of Mount Vernon
It is acceptable for Door 106F to have an emergency chain hoist release. Door 106E shall have the emergency egress as specified in the Specifications.
27. Flood Insurance Sub Limit Aug 1 2022 at 4:10 PM
- Anonymous Aug 1 2022 at 4:10 PMUser information is private
Regarding the Builders Risk insurance; are full limits ($36,750,000) of Earthquake and Flood required or are sublimits acceptable? And, if so, what is the sublimit you’ll want covered? - Aug 5 2022 at 2:07 PMCity of Mount Vernon
Flood and earthquake coverage will be required for the entire amount. The contractor shall be responsible for paying all deductibles.
28. Section 110500 - Library Equipment Aug 2 2022 at 8:57 AM
- Anonymous Aug 2 2022 at 8:57 AMUser information is private
In para 2.1 Materials , C Low shelves - it refers to custom wood top specified in section 064100 - please provide clarification of what thickness and materials that are specified? Do only the low shelves get canopy tops? D. End-panels - Custom wood as shown, refer to section 064100 - please clarify size and type of end panels required? - Aug 8 2022 at 1:41 PMCity of Mount Vernon
Please refer to Addendum 2.
29. Substitution Request Section 110500 Aug 2 2022 at 11:27 AM
- Anonymous Aug 2 2022 at 11:27 AMUser information is private
Section 110500, Cantilever Shelving System Can we add Estey Cantilever Library Shelving to the list of approved products for this project? - Aug 2 2022 at 2:34 PMCity of Mount Vernon
This Substitution Request will be addressed via Addenda.
30. Office Location Aug 2 2022 at 11:20 AM
- Anonymous Aug 2 2022 at 11:20 AMUser information is private
Div 28 specifications Part 1 - General 1.2 - 3 "office within 50 miles" Would the City consider ectending this radius to 75 miles? - Aug 10 2022 at 5:04 PMCity of Mount Vernon
Yes, this is acceptable.
31. Substitution request for section 07 25 00 Aug 2 2022 at 4:06 PM
- Anonymous Aug 2 2022 at 4:06 PMUser information is private
Will you accept a substitution request for Soprema Sopraseal Stick 1100T self-adhered WRB. - Aug 2 2022 at 4:24 PMCity of Mount Vernon
This Substitution Request will be addressed via Addenda.
32. Supplemental Bidder Responsibility Criteria Aug 3 2022 at 1:41 PM
- Aug 3 2022 at 1:41 PMCity of Mount Vernon
We are requesting a modification to the Supplemental Bidder Responsibility Criteria listed on pages 2 and 3 of section 00 11 53 of the Project Manual. We are very interested in this project and would love to be able to submit a bid for it, but the required past projects values are slightly higher than what we have completed in the past ten years. In the past ten years we have successfully completed five projects of similar scope and complexity with an average cost of $21,315,200 ranging from $17,975,000 to $26,342,000. The average size of these projects was around 70,000 square feet ranging from 45,000sf to 100,000sf. The project manager and superintendent we would propose for this project worked on all five of these projects so we would need the resume requirements modified in a similar manner for them to meet the criteria. Please let us know as soon as possible if the criteria will be modified so that we can meet the requirements. - Aug 3 2022 at 1:42 PMCity of Mount Vernon
The Responsibility Criteria will not be reduced/revised beyond what was revised via Addenda 1.
33. Soil Cells - Aggregate Subbase. Aug 3 2022 at 2:06 PM
- Anonymous Aug 3 2022 at 2:06 PMUser information is private
Section 32 94 00 Soil Cells - paragraph 3.9.A states - "Install Aggregate Subbase to the depths indicated on the Drawings". Drawing L5.31 shows the standard detail for the soil cells. There is no aggregate subbase shown. Is an aggregate subbase required for this soil cell Installation? If so please specify material and depth required. - Aug 8 2022 at 2:24 PMCity of Mount Vernon
Aggregate subbase is required below soil cell base. Install Aggregate subbase to meet manufacturer’s specifications and requirements for compaction, 4” depth minimum.
34. Soil Cell Layout Aug 3 2022 at 2:11 PM
- Anonymous Aug 3 2022 at 2:11 PMUser information is private
Sheet L5.31 shows the standard detail for the soil cells. It shows us installing them one unit high. Spec section 32 94 00 paragraph 2.2.A.2.d says that the soil cells will be 16" high. Sheet L1.11 shows us installing soil cells in areas where the the soil is >16". In those areas do we need to stack the soil cells so they are they same height as the depth of soil required? Or do we place soil below the units and only use 16" height of soil cells? - Aug 8 2022 at 2:24 PMCity of Mount Vernon
Soil cells to be installed one unit deep, per street section drawings on L5.03. Install soil depths based on cross-section information – this drawing should supersede soil depths at soil cell areas shown on L1.11. Do not place additional planting soil beneath soil cells – compacted aggregate subbase required per 32 94 00 Soil Cells.
35. Traffic Control Aug 3 2022 at 2:16 PM
- Anonymous Aug 3 2022 at 2:16 PMUser information is private
It is anticipated that there will be a large amount of traffic control required for this project. To help reduce those costs would we be able to re-channelize kincaid and 2nd st to allow for an open lane, to be used for construction, adjacent to the the north and west sides of the project site? - Aug 5 2022 at 11:14 AMCity of Mount Vernon
The City is allowing 3rd street between Kincaid and Broadway to be closed for the duration of the project and available to the contractor for staging, stockpiling, etc. There will be a time when the alley will be closed as well. During construction activities requiring impacts to 2nd Street and Kincaid Street, temporary lane shifts closing the outside lane, with an approved traffic control plan will be allowed for the duration of that scheduled work element. After that work element has been completed, the lane will be re-opened to traffic until at a future date required by the work schedule. It is anticipated that, except for sidewalk or in-street work (i.e. utilities), minimal traffic control will be required of the project on 2nd or Kincaid.
36. Substitution Request Section 26- Aug 3 2022 at 3:43 PM
- Anonymous Aug 3 2022 at 3:43 PMUser information is private
Substitution request for multiple electrical fixtures under Section 26-. Substitution request form and package sent to addenda email listed. Will this package need alternative options or be entirely approved? - Aug 11 2022 at 12:20 PMCity of Mount Vernon
Substitution Request is under review. Any approved items will be included in a forthcoming Addendum.
37. Wall Mounted Data Rack Aug 4 2022 at 10:46 AM
- Anonymous Aug 4 2022 at 10:46 AMUser information is private
Specification Section 2.13 The plans call for a lockable, wall mount IDF. Can the designer specify the part number of the cabinet? - Aug 10 2022 at 5:06 PMCity of Mount Vernon
See E6.01, issued via Addendum 2.
38. No subject Aug 4 2022 at 10:16 AM
- Anonymous Aug 4 2022 at 10:16 AMUser information is private
Sheet Number(s): A2.12 Detail Number(s): 1 Question: On Drawing A2.12, #144 Fire Riser shows flooring type (F) Carpet Tile CT-1 with Wood Base. Is this correct? Please confirm and revise if necessary. - Aug 4 2022 at 11:11 AMCity of Mount Vernon
Fire Riser Room 144 shall have Floor Finish Type D. This will be addressed in a forthcoming Addenda.
39. No subject Aug 4 2022 at 10:16 AM
- Anonymous Aug 4 2022 at 10:16 AMUser information is private
Sheet Number(s): A2.11 Detail Number(s): 1 Question: On Drawing A2.11, #136 Storage shows flooring type (K). There is no (K) listed on the Room Finish Schedule. Please advise to what flooring type (K) is or revise to the correct flooring type. - Aug 4 2022 at 11:11 AMCity of Mount Vernon
Storage 136 shall have Floor Finish Type I. This will be addressed in a forthcoming Addenda.
40. No subject Aug 4 2022 at 10:15 AM
- Anonymous Aug 4 2022 at 10:15 AMUser information is private
Sheet Number(s): A2.11 Detail Number(s): 1 Question: On Drawing A2.11, #108 E. Corridor shows flooring type (E) Resilient Flooring with Integral Base and #131 Interp. DSP shows flooring type (C) Polished Concrete with Wood Base. There is no transition line between those two products. Please provide a drawing showing the transition line. - Aug 4 2022 at 11:11 AMCity of Mount Vernon
E. Corridor 108 shall have Floor Finish Type C. Interpretive Display 131 shall have Floor Finish Type C. This will be addressed in a forthcoming Addenda.
41. Comparable product request - 07 21 00 - 2.1 Aug 4 2022 at 3:30 PM
- Anonymous Aug 4 2022 at 3:30 PMUser information is private
Johns Manville offers polyisocyanurate foam board insulation that is comparable to the other mfgs. listed in section 07 21 00 – 2.1 and we’d appreciate your consideration in adding JM as an approved equal. - Aug 9 2022 at 10:33 AMCity of Mount Vernon
Substitution Request was not accepted.
42. Section 110500 - Library Equipment Aug 5 2022 at 3:58 PM
- Anonymous Aug 5 2022 at 3:58 PMUser information is private
So in the drawings (A10.11 at the bottom), it says F.O.I.C. for Library Equipment. Is the City accepting bids for the Library equipment separately? I would like to submit a substitution request. Since it is not being provided by the contractor what is the substitution process? - Aug 10 2022 at 12:13 PMCity of Mount Vernon
Please send an inquiry only to the Project Architect, Christine Baldwin at the following email: [email protected]. Inquiries will be shared with the Owner.
43. 066413 Substitution Request Aug 8 2022 at 8:10 AM
- Anonymous Aug 8 2022 at 8:10 AMUser information is private
Can we add Glasteel Glasliner (FRP) to the list of approved products for this project? - Aug 8 2022 at 9:49 AMCity of Mount Vernon
If you would like to Submit a Substitution Request, please follow the protocol issued via Notice #1 under the Addenda & Notices tab.
44. Prevailing Wage/Davis Bacon Aug 8 2022 at 10:04 AM
- Anonymous Aug 8 2022 at 10:04 AMUser information is private
Regarding section 00 73 43 Paragraph A This section states that State of Washington Prevailing wage rates are applicable for this project. Since there are Federal funds contributing to this project, would Davis Bacon rates apply? If so, can you provide a General Decision rate schedule for this project? - Aug 10 2022 at 9:01 AMCity of Mount Vernon
Davis Bacon and State Prevailing Wage Rates are applicable to this project and the contractor is obligated to pay the higher of the tow rates. Davis Bacon Rates are to be published or updated within ten days of bid opening; the City will be publishing via addenda shortly.
45. Ground Improvement Aug 8 2022 at 10:10 AM
- Anonymous Aug 8 2022 at 10:10 AMUser information is private
Please clarify whether ground improvement/ by aggregate piers/stone columns can extend beyond the property line of if the intent is for all ground improvement to be performed beneath the footprint of the structure. - Aug 11 2022 at 3:19 PMCity of Mount Vernon
Ground improvements can extend past the property line(s). They may not interfere with existing utilities.
46. Subgrade Modulus Aug 8 2022 at 10:11 AM
- Anonymous Aug 8 2022 at 10:11 AMUser information is private
Notes on Sheet S0.01 include requirements for satisfying subgrade modulus of 50 PCI for all footings and slabs. Presumably, this 50 PCI value is a composite value, with weighted contribution from the modulus of the aggregate piers themselves and the modulus of the soil between the piers. Please provide a baseline value for the subgrade modulus of the existing subgrade in its current pre-improvement condition. The 50 PCI value implies 1 inch of settlement for 7200 psf footing load. Please clarify whether it the 50 PCI is needed for static or seismic loading conditions. - Aug 9 2022 at 9:51 AMCity of Mount Vernon
With regard to existing subgrade modulus, GeoEngineers did not determine a pre-improvement value. However, a value can be assumed based on the conditions provided in their geotechnical report dated March 7, 2022. With regard to the 50 pci subgrade modulus value, this is a composite value for the static, post ground improvement condition. Per GeoEngineers’ May 2, 2022 addendum report, static settlement is to be limited to 1 inch. However, the post-liquefaction settlement tolerance is up to 2½ inches which allows an alternative modulus for seismic.
47. Substitution Request for Bird Spikes Aug 8 2022 at 10:30 AM
- Anonymous Aug 8 2022 at 10:30 AMUser information is private
Bird spikes are specified under section 108113. Can Bird-X All-Steel Spikes be approved as an equal product and used for this scope of work? - Aug 8 2022 at 10:33 AMCity of Mount Vernon
If you would like to Submit a Substitution Request, please follow the protocol issued via Notice #1 under the Addenda & Notices tab.
48. Traffic Coating and Concrete Finishes Aug 8 2022 at 10:52 AM
- Anonymous Aug 8 2022 at 10:52 AMUser information is private
Spec Section 07 14 16 (3.11A) Calls for Flood Testing at all completed membrane and flashing systems. Is it acceptable to replace this flood test with ELD (Electronic Leak Detection) testing? - Aug 9 2022 at 2:52 PMCity of Mount Vernon
No, Flood Testing shall be performed as specified. PLEASE SEE QUESTION #124 FOR REVISED RESPONSE TO THIS QUESTION.
49. Request Substitution Allowance on SPD Aug 8 2022 at 11:39 AM
- Anonymous Aug 8 2022 at 11:39 AMUser information is private
Can we submit an alternate product per SECTION 26 24 13, PARAGRAPH NO. J. SURGE PROTECTIVE DEVICE (SPD)? Requesting to bid with SCHNEIDER ELECTRIC - SQUARE D - EMA & XDSE series. - Aug 10 2022 at 8:57 AMCity of Mount Vernon
If you would like to Submit a Substitution Request, please follow the protocol issued via Notice #1 under the Addenda & Notices tab.
50. No subject Aug 8 2022 at 2:40 PM
- Anonymous Aug 8 2022 at 2:40 PMUser information is private
Would the City approve Generac as a manufacturer for the 500kW generator? Who should I send the substitution request package to for this? - Aug 9 2022 at 8:44 AMCity of Mount Vernon
If you would like to Submit a Substitution Request, please follow the protocol issued via Notice #1 under the Addenda & Notices tab.
51. A6.37 - LIBRARY SHELVING TOP AND END PANEL DETAILS Aug 8 2022 at 3:44 PM
- Anonymous Aug 8 2022 at 3:44 PMUser information is private
Detail 10 calls out for mobile with casters. Can you specific which shelving stack is mobile? - Aug 11 2022 at 2:27 PMCity of Mount Vernon
Please see Sheet A10.10. Shelving Stacks labeled as "Moveable Units" are mobile shelving stacks with casters. They are located in Youth Services 116, Young Adult 113, and REF/HOLDS/NEW 109. See Addendum 3 for additional information on mobile units.
52. 110500 - Library Equipment Aug 9 2022 at 10:19 AM
- Anonymous Aug 9 2022 at 10:19 AMUser information is private
The library shelving is being purchased by the Owner - In this section we are being requested to bid on these two items Para 2.1 Materials A; 1 & 2 Book Drop & Thru Wall Depository- will these and the installation of the library shelving be the only items to be bid? - Aug 9 2022 at 2:33 PMCity of Mount Vernon
The Book Drop and Thru-Wall Depository specified in 11 05 00 Library Equipment shall be furnished by the Contractor and installed by the Contractor. Library shelving is to be furnished by the Owner; it shall be coordinated and installed by the Contractor, see Alternates.
53. LPR Cameras (C-10 and C-11) Aug 9 2022 at 10:19 AM
- Anonymous Aug 9 2022 at 10:19 AMUser information is private
Question about the 2 LPR Cameras (C-10 and C-11). Is the intent to recognize a license plate and store the meta data or do they want to be capable of reading the license plate during live or recorded video? Arecont does not make a specific LPR camera. - Aug 10 2022 at 1:21 PMCity of Mount Vernon
The specified fixed camera meets the Design Intent for license plate recognition.
54. Flow control substitution request Aug 9 2022 at 3:07 PM
- Anonymous Aug 9 2022 at 3:07 PMUser information is private
Is Hydronic Components, Inc. an acceptable manufacturer for flow control of the HVAC equipment? - Aug 10 2022 at 1:44 PMCity of Mount Vernon
Substitution Request accepted; will be included in Addendum 4.
55. Specs/Performance Criteria - Design Build RAP Aug 10 2022 at 8:13 AM
- Anonymous Aug 10 2022 at 8:13 AMUser information is private
There is no specification or performance criteria in the project documents for the ground improvement. What is the performance criteria for the ground improvement system in terms of static total and differential settlement, seismic differential settlement over 40 feet? Also, is the performance criteria for the slab the same as the foundations? - Aug 11 2022 at 4:20 PMCity of Mount Vernon
Please reference the response to Question 46 Subgrade Modulus.
56. Security System Interface Aug 10 2022 at 9:04 AM
- Anonymous Aug 10 2022 at 9:04 AMUser information is private
In 28 16 00 1.1.A.1 the spec states that the intrusion panel should be a Bosch D9412GV4 (this panel is discontinued) In 28 13 00 2.1.E.1 the spec states that the access system must integrate with a Honeywell Security System. Please provide clarification over which system type is required and, if Bosch, which panel you would like used in place of the stated discontinued D9412GV4. - Aug 10 2022 at 5:07 PMCity of Mount Vernon
In lieu of discontinued panel, provide Bosch B9512G.
57. PV System Voltage Aug 10 2022 at 10:31 AM
- Anonymous Aug 10 2022 at 10:31 AMUser information is private
Specs 26 31 00 – 6, Part 2.2 System, A. says" AC Output Voltage 120/208V 3 phase, 60hz". But drawing E600 shows 277/480V main panel interconnection. Please confirm PV System AC Voltage. - Aug 10 2022 at 5:09 PMCity of Mount Vernon
277/480 V connection.
58. PV racking Aug 10 2022 at 10:29 AM
- Anonymous Aug 10 2022 at 10:29 AMUser information is private
Specs 26 31 00 – 2, Part 1 - General, G. says “The array will be installed on a flat roof with a ballasted roof support system”. Also Specs 26 31 00 – 5, Part 2 Products, C. Racking Basis of Design says "Dynoraxx Evolution or Equal". Dynoraxx Evolution is a ballasted racking product, but we don't see any flat roof ballasted arrays in the plans. Please confirm that the only solar panel support required is the HSS PV Support Arm on Sheet A2.24. - Aug 11 2022 at 8:52 AMCity of Mount Vernon
There are no ballasted roofs on the project. The Solar PV panels are supported by the HSS structural members as shown on Architectural and Structural Drawings. This will be addressed in a forthcoming Addenda.
59. Electrical Panel H1B Aug 10 2022 at 10:42 AM
- Anonymous Aug 10 2022 at 10:42 AMUser information is private
Sheet E3.13 shows electrical panel "H1B" but it's not on the electrical single line diagram. Please provide the feeder size and panel schedule. - Aug 10 2022 at 5:10 PMCity of Mount Vernon
Please see updated One Line Diagram issued via Addendum 2.
60. PV racking Aug 10 2022 at 10:41 AM
- Anonymous Aug 10 2022 at 10:41 AMUser information is private
Sheet A2.24 - Is the solar panel connection to “HSS PV Support Arm” assumed to be bolted to the PV module frame via the manufacturer-provided bolt holes on the PV module? Can the HSS PV Support Arms be located and positioned to match the measurements of the manufactured holes in the solar modules? - Aug 11 2022 at 8:56 AMCity of Mount Vernon
The HSS PV Support Arm shown in the Architectural and Structural Drawings can move laterally to be positioned to match the manufactured holes in the solar panel module frame.
61. Schedule Aug 10 2022 at 10:43 AM
- Anonymous Aug 10 2022 at 10:43 AMUser information is private
What is the expected project timeline? Is there an anticipated completion date? - Aug 10 2022 at 10:57 AMCity of Mount Vernon
Please reference the Advertisement for Bid for these answers.
62. Electrical Panel LVR H1A Aug 10 2022 at 10:47 AM
- Anonymous Aug 10 2022 at 10:47 AMUser information is private
The electrical single line diagram shows panel "LVR H1A" to be fed from panel H1A. However there is no feeder size shown and no panel schedule. As well as panel schedule H1A doesn't show any circuits to feed panel LVR H1A. Please advise. - Aug 10 2022 at 5:45 PMCity of Mount Vernon
LVR is a low voltage relay panel. See Lighting Control Schedule for circuits connected to LVR. This will be addressed in Addendum 4.
63. PV System Aug 10 2022 at 10:47 AM
- Anonymous Aug 10 2022 at 10:47 AMUser information is private
Would the owner consider taking possession (and paying for) materials early to avoid potential price escalation? In particular, the PV modules? - Aug 11 2022 at 4:16 PMCity of Mount Vernon
This would be considered on a case-by-case basis. Section 6.03.D of the General Conditions governs how payments may be made for such materials and the requirements the GC needs to comply with if requesting payment for materials stored off-site and not incorporated into the Work.
64. Bldg Disconnect Aug 10 2022 at 10:51 AM
- Anonymous Aug 10 2022 at 10:51 AMUser information is private
The electrical single line has the building disconnect shown between the ATS and the generator. However the building disconnect location is not shown on the electrical drawings. Please advise. - Aug 10 2022 at 5:47 PMCity of Mount Vernon
The intent is for the Building Disconnect to be located on the roof adjacent the ATS. This will be addressed in future Addendum.
65. EV Chargers Aug 10 2022 at 10:58 AM
- Anonymous Aug 10 2022 at 10:58 AMUser information is private
Specification section 011100 gives direction that two EV charging stations to be furnished and installed by the Owner. Please confirm the (2) EV charging stations noted are refering to all of the chargers that are the two styles, level 2 & level 3, and the electrical contractor is to provide the electrical feeders only for all of the EV charger as shown on the electrical drawings. - Aug 11 2022 at 1:16 PMCity of Mount Vernon
Section 01 11 00 Paragraph 1.4D notes that the two (2) EV Charging stations are to be installed by others only, not furnished. The two (2) chargers to be installed by others will be Level 2 Chargers as specified.
66. PV Inverter Substitution Aug 10 2022 at 11:08 AM
- Anonymous Aug 10 2022 at 11:08 AMUser information is private
Spec 26 31 00 – 5, Part 2 Products, "B. Inverter Basis of Design: Solectria or Equal" -We would like to propose the SolarEdge 100kW as an equal or better substitute. Spec Sheet emailed to [email protected] - Aug 11 2022 at 6:24 PMCity of Mount Vernon
Substitution Request has been accepted. Acceptance will be noted in Addendum 4.
67. Lighting Prior Submittals Aug 10 2022 at 11:44 AM
- Anonymous Aug 10 2022 at 11:44 AMUser information is private
Lighting Prior Submittals / Substitutions Attached is our Dropbox link to our lighting prior submittal for the Mount Vernon Library Commons. https://www.dropbox.com/s/io6l8043x5sqaif/City_of_Mount_Vernon__Mount_Vernon_Library_Commons__Phase%20HKP%20Architects.pdf?dl=0 If you have any questions, please feel free to contact me. - Aug 11 2022 at 12:20 PMCity of Mount Vernon
Substitution Request is under review. Any approved items will be included in a forthcoming Addendum.
68. Substitution Request VAV Boxes Aug 10 2022 at 12:29 PM
- Anonymous Aug 10 2022 at 12:29 PMUser information is private
Is Enviro-Tec an acceptable substitution for the single duct variable air volume units? - Aug 10 2022 at 1:41 PMCity of Mount Vernon
Substitution Request accepted; will be included in Addendum 4.
69. Bid Date Extension to 8/25 Aug 10 2022 at 1:33 PM
- Anonymous Aug 10 2022 at 1:33 PMUser information is private
With the anticipated issuance of Addenda #3 and all the ongoing Q&A we feel that a schedule extension would help us to put together a better price for the project as there is a lot of new information. Would it be possible to push the bid date 1 week so bids are due 8/25. - Aug 11 2022 at 9:57 AMCity of Mount Vernon
At this time, there is no extension to the Bid Date.
70. Unistrut Framing System Aug 10 2022 at 2:13 PM
- Anonymous Aug 10 2022 at 2:13 PMUser information is private
- Section 05 50 00; Paragraph 1.3 E: The performance requirements and/or design loads for the delegated design Unistrut Framing System are not included in the bid documents. Please provide the requirements of this system including the design loads. - Aug 11 2022 at 11:20 AMCity of Mount Vernon
The intent of the Bidder Designed system is to include engineering based on the equipment and piping loads required, as shown and as coordinated with all relevant trades. Design Loads are to be determined by the Bidder.
71. Permits, Fees & Notices Aug 10 2022 at 2:16 PM
- Anonymous Aug 10 2022 at 2:16 PMUser information is private
-00 72 00 5.02 Permits, Fees, and Notices: What is the right-of-way permit review and lead time for the City of Mt Vernon? - Aug 10 2022 at 2:27 PMCity of Mount Vernon
Within one week.
72. Sidewalk Closures Aug 10 2022 at 2:14 PM
- Anonymous Aug 10 2022 at 2:14 PMUser information is private
- Multiple Sheet Numbers/Locations: Do the sidewalks directly adjacent to the work require sidewalk right-of-way closure permits and associated fees (east sidewalk along S 2nd St, west sidewalk along S 3rd St, South sidewalk along W Kinkaid St)? - Aug 10 2022 at 2:27 PMCity of Mount Vernon
These locations will all be covered in the one right way permit and associate are approximately $125-$200.
73. Alley Closure Aug 10 2022 at 2:15 PM
- Anonymous Aug 10 2022 at 2:15 PMUser information is private
- Multiple Sheet Numbers/Locations: Does the alley along the south side of the structure require a right-of-way closure permit? - Aug 10 2022 at 2:28 PMCity of Mount Vernon
Alley is also covered the right of way permit as above.
74. Design Review Period Aug 10 2022 at 2:16 PM
- Anonymous Aug 10 2022 at 2:16 PMUser information is private
-Multiple Specification Sections and paragraphs: What is the assumed delegated design review period for the City of Mt Vernon to be carried in the construction CPM schedule and submittal schedule? - Aug 11 2022 at 9:04 AMCity of Mount Vernon
The Contractor needs to coordinate with the relevant permitting agency.
75. Casework Substitution Aug 10 2022 at 2:15 PM
- Anonymous Aug 10 2022 at 2:15 PMUser information is private
Custom Source Woodworking would like to be approved as an alternate manufacturer for casework. - Aug 11 2022 at 12:20 PMCity of Mount Vernon
Substitution Request is under review. Any approvals will be included in a forthcoming Addendum.
76. Alley Access Aug 10 2022 at 2:15 PM
- Anonymous Aug 10 2022 at 2:15 PMUser information is private
- C2.10: Will continuous access during construction to the trash collection and covered parking structure of the buildings addressed 823 S 3rd St and 215 W Broadway be required via the alley and S 3rd St? - Aug 10 2022 at 3:18 PMCity of Mount Vernon
It is anticipated that there will be a point in construction when alley access will be closed and residence will be required to use street parking and at that time trash collection will be rerouted to Broad.
77. Bumper Curbs Aug 10 2022 at 2:21 PM
- Anonymous Aug 10 2022 at 2:21 PMUser information is private
Section32 17 13, Paragraph 2.1 A.1: Oldcastle Infrastructure no longer manufacturers bumper curbs. Please provide a revised basis of design product for parking bumpers. - Aug 11 2022 at 9:20 AMCity of Mount Vernon
Revised Basis of Design shall be as follows: Basis of Design: Bode’s Precast Concrete 6’ Wheel Stop with Drain, or approved. This will be included in a forthcoming Addenda.
78. Permits, Fees & Notices II Aug 10 2022 at 2:17 PM
- Anonymous Aug 10 2022 at 2:17 PMUser information is private
-00 72 00 5.02 Permits, Fees, and Notices: Please provide the right-of-way permit fee schedule referenced in Chapter 12.22.120 A of the Mt Vernon Municipal Code. - Aug 10 2022 at 3:20 PMCity of Mount Vernon
Please see City website under Development Services.
79. East Terrace Planter Box Aug 10 2022 at 3:13 PM
- Anonymous Aug 10 2022 at 3:13 PMUser information is private
Sheet A2.91 - Roof Details indicates multiple layers of varying materials on Detail 4. Please provide more specific details on which products are intended/acceptable for this location. Detail 4 of the same sheet notes 'see detail 4/A2.81 for similar notes'. Is this a reference to the detail listed above? - Aug 11 2022 at 4:17 PMCity of Mount Vernon
Specification Section 07 72 73 VEGETATED ROOF SYSTEMS will be added and Sheet A2.91 will be reissued with Addendum 4. Revisions to Details 4 and 5 on A2.91 will address this question.
80. 01 81 13 SUSTAINABILITY DESIGN REQUIREMENTS Aug 10 2022 at 8:31 PM
- Anonymous Aug 10 2022 at 8:31 PMUser information is private
For the blower door testing required to meet Passive House standards, can penetrations in the Passive House Boundary such as the book drops and ductwork to the kitchen area be sealed? - Aug 11 2022 at 9:47 AMCity of Mount Vernon
Yes.
81. 26 32 13 - EMERGENCY ENGINE GENERATOR EQUIPMENT Aug 10 2022 at 8:25 PM
- Anonymous Aug 10 2022 at 8:25 PMUser information is private
The generator appears to be substantially undersized for its connected load. Metering intent and ATS quantity on E6.00 conflicts with Section 2.4.L & 2.6 in specification 26 32 13. Please confirm how load can be incrementally staged or selectively shed to maintain power to emergency load and ensure system reliability. - Aug 11 2022 at 6:24 PMCity of Mount Vernon
A revised Specification will be issued via Addendum 4 to address this. Specification will be updated to align both One Line Diagram and Specification for load shed.
82. 01 81 13 SUSTAINABILITY DESIGN REQUIREMENTS Aug 10 2022 at 8:32 PM
- Anonymous Aug 10 2022 at 8:32 PMUser information is private
The kitchen is excluded from the passive house envelope on A0.40, but included on A0.27. Please clarify and confirm any additions to the passive house penetration schedule on A0.40. - Aug 11 2022 at 9:57 AMCity of Mount Vernon
The Kitchen is excluded from the Passive House Envelope as shown on A0.40. The reason the Kitchen is included on A0.27 is that the Kitchen is still considered part of the Conditioned Building Area per the Washington State Energy Code. No changes to the Passive House Penetration Schedule on A0.40.
83. E6.00 UFER Aug 10 2022 at 8:34 PM
- Anonymous Aug 10 2022 at 8:34 PMUser information is private
Switchboard H1 appears to be grounded from a ground bus to building steel, a UFER system, and the water main. Clarify the intent of the (3) additional ground connections from the neutral bus. - Aug 11 2022 at 2:43 PMCity of Mount Vernon
Provide grounding connections as shown and per inspector requirements.
84. Electrical Service Aug 10 2022 at 8:36 PM
- Anonymous Aug 10 2022 at 8:36 PMUser information is private
Confirm scope delineation between contractor and electric utility, including conduit, conductors, equipment, and make ready work such as concrete pads and underground vaults. 2-4" BLDG service indicated on C5.11, but not indicated/continued on C5.10, 3000A service (likely more than 2 conduit) indicated on E3.12. Confirm utility conduit quantity and route if in contractor's scope. - Aug 12 2022 at 3:02 PMCity of Mount Vernon
Civil Drawings will be revised to reference Electrical plans for number of electrical service conduits. These revisions will be issued in a forthcoming Addendum. Secondary feeders are indicated on feeder chart on Sheet E6.00.
85. Site Electrical Aug 10 2022 at 8:39 PM
- Anonymous Aug 10 2022 at 8:39 PMUser information is private
Is there any electrical site work such as lighting, signage power, convenience power, security or other? Please provide electrical site plan or narrative. - Aug 11 2022 at 6:24 PMCity of Mount Vernon
All Site Electrical work is included on electrical plans.
86. 01 23 00 ALTERNATES Aug 10 2022 at 8:40 PM
- Anonymous Aug 10 2022 at 8:40 PMUser information is private
Are generator feeders and feeders from the ATS to/from switchboard H1/HXE base or alternate scope? Provide intended route for 3000A feeder from Switchboard H1 to ATS and from ATS to Switchboard HXE. - Aug 12 2022 at 3:26 PMCity of Mount Vernon
Generator is an Alternate. Base Bid Design is intended to be generator ready. If Alternate is not taken, the infrastructure shall remain to accommodate a generator in the future. This will be clarified in Addendum 4.
87. 01 23 00 ALTERNATES Aug 10 2022 at 11:15 PM
- Anonymous Aug 10 2022 at 11:15 PMUser information is private
Please confirm the primary structure is engineered to accommodate the additional design loads imposed by Bid Alternate #1 Generator Set - Aug 11 2022 at 12:20 PMCity of Mount Vernon
Yes, structural design of primary structure has been designed to accommodate additional loads imposed by Bid Alternate #1 Generator Set.
88. 01 43 39 MOCKUPS Aug 10 2022 at 11:17 PM
- Anonymous Aug 10 2022 at 11:17 PMUser information is private
Quantity, size and extent of Integrated Exterior Mockups and Integrated Interior Mockups required by 01 43 39 MOCKUPS is not indicated on the drawings. Please graphically indicated quantities, size and extents. - Aug 11 2022 at 4:32 PMCity of Mount Vernon
This will be addressed in a forthcoming Addendum.
89. 26 27 45 PARKING AND PAYMENT SYSTEMS Aug 10 2022 at 11:19 PM
- Anonymous Aug 10 2022 at 11:19 PMUser information is private
01 23 00 ALTERNATES Bid Alternate #6 says to "ADD installation of Parking Availability Signaling System as shown and specified". 26 27 45 PARKING AND PAYMENT SYSTEMS says to "Provide a complete design, materials and installation for a parking guidance system and pay station management as directed by City of Mount Vernon." Please clarify if the Alternate #6 is to include installation of an Owner furnished system or if the Contractor is to design, furnish and install this system complete. - Aug 12 2022 at 3:02 PMCity of Mount Vernon
See revised Alternate Description in forthcoming Addendum.
90. 11 05 00 LIBRARY EQUIPMENT Aug 10 2022 at 11:24 PM
- Anonymous Aug 10 2022 at 11:24 PMUser information is private
Library Stack General Note #1 on A10.11 says 'ALL STACKS ARE FOIC" which conflicts with Base Bid description for Bid Alternate #2 in 01 23 00 ALTERNATES which says "No library stack installation." Please clarify the responsibility of this contractor for base bid and alternate. - Aug 11 2022 at 11:27 AMCity of Mount Vernon
Please reference Addendum 2. This question is addressed under the "Drawings" section of the Addendum, sheets A10.10 and A10.11.
91. 01 23 00 ALTERNATES Aug 10 2022 at 11:26 PM
- Anonymous Aug 10 2022 at 11:26 PMUser information is private
Please confirm the bench in detail 5/A2.91 is part of Bid Alternate #7: Roof Terrace Trellis and Pavers. Please also confirm the bench steel is intended to be part of specification 05 50 00 "Metal Fabrications" (Miscellaneous steel framing and supports.) - Aug 11 2022 at 5:43 PMCity of Mount Vernon
The East Terrace bench illustrated in Detail 5/A.91 is part of the Base Bid. The bench steel support will be added to Specification Section 05 50 00 Metal Fabrications via a forthcoming Addendum.
92. 26 27 46 - ELECTRIC VEHICLE CHARGING SYSTEM Aug 10 2022 at 11:32 PM
- Anonymous Aug 10 2022 at 11:32 PMUser information is private
Drawing A0.20 indicates (72) parking stalls with installed Level 2 EV chargers. E8.03 indicates (82) branch circuits to Level 2 EV chargers. Drawing A0.20 also indicates infrastructure for future Level 1 chargers. The electrical drawings only indicate Level 2 and Level 3 (DCFC) infrastructure. Please also confirm all EV chargers do not require communication cabling. - Aug 12 2022 at 8:16 AMCity of Mount Vernon
Drawing A0.20 incorrectly notes Level 1 chargers. This will be revised via Addendum 4. Drawing A0.20 indicates the quantity of parking stalls served by EV chargers; it does not indicate the quantity of EV charging stations or branch circuits. See Electrical Drawings for quantities of EV Charging stations, quantity of branch circuits, and infrastructure for future EV chargers. EV chargers do not require communication cabling.
93. 02 41 00 SELECTIVE SITE DEMOLITION Aug 10 2022 at 11:39 PM
- Anonymous Aug 10 2022 at 11:39 PMUser information is private
Can the Geotechnical or Civil Engineer please provide a general description of "Defunct Building Structural Remnants" to be demolished as indicated in the Geotech Report Figure 2 and C2.10 in the NW corner of the site? - Aug 11 2022 at 2:27 PMCity of Mount Vernon
Subterranean explorations were not conducted to determine the extent of the “Defunct Building Structural Remnants.” However, we do believe they may be concrete columns/footings from a gas station that was previously on the property. For the purposes of Bidding, Contractor shall assume “Defunct Building Structural Remnants” shown on the Survey extend 36” below existing grade.
94. PSE Reroute Aug 10 2022 at 11:43 PM
- Anonymous Aug 10 2022 at 11:43 PMUser information is private
Per Keynote 1 on C5.10, please provide a sketch for the PSE system reroute so General Contractor and estimate reroute support. If no drawing or sketch is provided, please provide an GC allowance to support reroute. - Aug 12 2022 at 9:32 AMCity of Mount Vernon
Keynote 1 references are shown throughout C5.10 and C5.11 plan views, and document preliminary layout of PSE reroute and primary infrastructure based on PSE coordination. Revised Sheets C5.10, C5.11, and C5.16 will be issued via Addendum 4 to provide additional information. PSE will document final layout.
95. 07 54 00 THERMOPLASTIC MEMBRANE ROOFING Aug 10 2022 at 11:57 PM
- Anonymous Aug 10 2022 at 11:57 PMUser information is private
Please confirm that a TPO membrane as specified in 07 54 00 and the roof assembly shown on A0.31 is the desired and appropriate roof membrane at green roof locations. Otherwise please provide new roof assembly and spec. - Aug 11 2022 at 4:17 PMCity of Mount Vernon
Specification Section 07 72 73 VEGETATED ROOF SYSTEMS will be added and Sheet A2.91 will be reissued with Addendum 4. Revisions to Details 4 and 5 on A2.91 will address this question.
96. 05 50 00 METAL FABRICATIONS Aug 11 2022 at 12:03 AM
- Anonymous Aug 11 2022 at 12:03 AMUser information is private
Custom Gates & Screens are indicated as Design/Build by Architectural Elements in Paragraph 2.3. Architectural Elements has declined to bid to all General Contractors bidding the project. Please identify alternate approved design/build fabricators for Gates #1-6. - Aug 11 2022 at 11:21 AMCity of Mount Vernon
Any fabricators who meet the requirements of Section 05 50 00 1.4.A. are eligible to bid. Potential fabricators who may meet the requirements include EDCO, Superior Systems, Pacific Architectural Metals, Decorative Metal Arts, and other regional fabricators.
97. 08 80 00 GLAZING Aug 11 2022 at 12:10 AM
- Anonymous Aug 11 2022 at 12:10 AMUser information is private
The exterior window in Conference Room [142], #35, is not included in the window schedule on A7.20. Please provide info. - Aug 11 2022 at 4:17 PMCity of Mount Vernon
A revised A7.20 will be issued as part of Addendum 4 to include Window #35.
98. 12 21 00 WINDOW BLINDS Aug 11 2022 at 5:02 AM
- Anonymous Aug 11 2022 at 5:02 AMUser information is private
We request a substitution approval of Lumenomics - SunOrShade manual and motorized roller shades for the products specified in 12 21 00 WINDOW BLINDS. The substitution request form and supporting material have been sent to [email protected] - Aug 11 2022 at 4:20 PMCity of Mount Vernon
Substitution Request has been approved. It will be noted in a forthcoming Addendum.
99. Canopy Roof Decking Aug 11 2022 at 7:17 AM
- Anonymous Aug 11 2022 at 7:17 AMUser information is private
Plan S2.24, Details 1 & 2. Please clarify profile and Gauge of roof decking for the the two elevator canopies. - Aug 12 2022 at 3:02 PMCity of Mount Vernon
This will be addressed in a forthcoming Addenda.
100. Sign Type GG - Etched Glass Aug 11 2022 at 8:09 AM
- Anonymous Aug 11 2022 at 8:09 AMUser information is private
In the Signage Schedule (A8.11) and Wayfinding and Building Signage Packet following Specifications section 10 14 23, sign type GG has the note "Coordinate with supplier and installer." Does this mean we will have the glazing delivered to us for etching by the supplier, and we will forward delivery to the installer? OR Is the etching to be done on site after installation? - Aug 11 2022 at 8:46 AMCity of Mount Vernon
This is up to Contractor's Means and Methods.
101. Terracotta Baguette Sun Control Devices Aug 11 2022 at 8:44 AM
- Anonymous Aug 11 2022 at 8:44 AMUser information is private
Will you accept a substitution request for the Sun Control Devices and all of their assembly component's? - Aug 11 2022 at 12:08 PMCity of Mount Vernon
This Substitution Request has not been accepted.
102. Striping Aug 11 2022 at 9:19 AM
- Anonymous Aug 11 2022 at 9:19 AMUser information is private
Sheets C6.10 and C6.11: Civil paving plans indicate replacement of existing striping and new striping on S 2nd St, W Kincaid St, S 3rd St and the Alley to the south of the structure. Please provide striping specifications. - Aug 12 2022 at 8:22 AMCity of Mount Vernon
As noted on the paving plans and paving specification, striping and pavement specifications shall be per City of Mount Vernon Engineering Standards, MUTCD Specifications, and WSDOT Standard Specifications.
103. Elevator Jack Shafts Aug 11 2022 at 9:20 AM
- Anonymous Aug 11 2022 at 9:20 AMUser information is private
Section 14 24 00: The specified elevator type has an inground jack shaft. The drawings do not indicate any jack holes to be drilled at the elevator locations. Please provide location, depth, and other requirements for the elevator jack shafts. - Aug 11 2022 at 11:31 AMCity of Mount Vernon
The exact jack hole location will need to be coordinated with the elevator manufacturer as it may vary by a few inches between manufacturers. The jack hole depth is measured from top of slab in the elevator pit to the total rise (lowest landing to highest landing) + 2’-6”. The jack hole will need to be provided with a casing. Jack hole diameter needs to be coordinated with the elevator manufacturer as it depends on the size jack they use. This will be addressed in a forthcoming Addendum.
104. 01 81 13 SUSTAINABILITY DESIGN REQUIREMENTS Aug 11 2022 at 10:36 AM
- Aug 11 2022 at 10:36 AMCity of Mount Vernon
For the blower door testing required to meet Passive House standards, can penetrations in the Passive House Boundary such as the book drops and ductwork to the kitchen area be sealed? - Aug 11 2022 at 10:38 AMCity of Mount Vernon
Some sealing of building components such as those mentioned above are allowed to be sealed for testing, but they are regulated by PHIUS. Final approval shall come from the Third-Party Rater through pre-test coordination. Please note that the response to this question supersedes the response given to Question #80. This will be addressed in a forthcoming addendum.
105. Asphalt Overlay Aug 11 2022 at 11:07 AM
- Anonymous Aug 11 2022 at 11:07 AMUser information is private
Sheets C6.10 and C6.11 show a note 9 sawcut line (typ) on Kincaid Street at outside edge of the overlay. I have never seen a saw cut line like this before, as usually the leading edge of the profiler is sufficient. Can you provide a detail for this scope of work. - Aug 12 2022 at 8:22 AMCity of Mount Vernon
The sawcut call out on paving plans has been revised to point to sawcut line, and linetype of grind and overlay has been clarified. Revised Sheets C6.10 and C6.11 will be issued via Addendum 4.
106. Kincaid St Sewer Flow Aug 11 2022 at 11:21 AM
- Anonymous Aug 11 2022 at 11:21 AMUser information is private
The existing sewer flow volume of 8" Kincaid Street line is? Is this a combined storm / sewer line? - Aug 15 2022 at 12:17 PMCity of Mount Vernon
The main is a combined sewer and flows will vary.
107. Section 07.14.16 Traffic Coating Aug 11 2022 at 11:19 AM
- Anonymous Aug 11 2022 at 11:19 AMUser information is private
We would like to propose Miracoat/Crossfield as an equal product to Kemper for the traffic coating. Substitution request form will be sent. - Aug 11 2022 at 5:43 PMCity of Mount Vernon
This Substitution Request has not been accepted.
108. Provide Access to Carport Aug 11 2022 at 11:31 AM
- Anonymous Aug 11 2022 at 11:31 AMUser information is private
Sheet C3.10. I can assume this note of provide access to the carport is for pedestrian access only. Requiring vehicle access to this carport will put a constraint on the project's constructability and will increase costs. - Aug 12 2022 at 3:39 PMCity of Mount Vernon
See answer to Question 76, when construction begins to impinge on the alley the alley will be closed to vehicles and pedestrians and private parking will be rerouted/allow on Broad.
109. Water Repellants (Masonry) Aug 11 2022 at 12:12 PM
- Anonymous Aug 11 2022 at 12:12 PMUser information is private
Specification 07 19 00 section 3.3 says to apply water repellents to “all masonry surfaces within 20 feet of grade”. Does this include the masonry surfaces exposed to the interior of the parking garage levels at the upper levels beyond 20 feet from grade? - Aug 11 2022 at 4:17 PMCity of Mount Vernon
Masonry Surface exposed to the interior of the Parking Garage Levels shall receive water repellents from the level of the adjacent parking level slab, to 20' above slab, or until masonry terminates. This will be addressed in a forthcoming addendum.
110. Water Repellant/Anti-Graffiti Coatings Aug 11 2022 at 12:16 PM
- Anonymous Aug 11 2022 at 12:16 PMUser information is private
Specification 07 19 00 calls for a minimum of two layers of water repellent, and Specification 09 19 00 does not specifically state how many layers are required. Please clarify how many coatings of each are desired, if alternating products are intended. Specification 09 19 00 does not specify where the anti-graffiti coatings are intended to be placed. Please clarify. - Aug 11 2022 at 4:17 PMCity of Mount Vernon
Anti-Graffiti Coating shall be applied to all masonry surfaces within 10 feet of grade. This also includes the masonry surfaces exposed to the interior of the parking garage levels. Masonry at parking garage levels shall receive anti-graffiti coating as follows: Second and Third Floor: from parking slab, up to termination of masonry and underside of parking slab above. Fourth Floor: 10 feet in height This will be addressed in a forthcoming addendum.
111. Waterproofing/Anti-Graffiti - Products/Warranty Aug 11 2022 at 12:19 PM
- Anonymous Aug 11 2022 at 12:19 PMUser information is private
Specification 07 19 00 lists Protectosil CHEM-TRETE 40 VOC as basis of design, with products from Cathedral, Euclid, Vexcon, and PROSOCO as acceptable alternatives. Specification 09 19 00 only lists Protectosil ANTIGRAFFITI as the basis of design. Can the acceptable manufacturers listed in 07 19 00 be considered for this scope as well to avoid potential warranty concerns? - Aug 12 2022 at 3:02 PMCity of Mount Vernon
Yes. This will be addressed in a forthcoming Addendum.
112. 09 90 00 PAINTING AND COATING Aug 11 2022 at 1:48 PM
- Anonymous Aug 11 2022 at 1:48 PMUser information is private
Traffic coating and concrete finishes sheet A2.60 calls out Alternate: TRAF-1 at the Level 4 roof and ramp. Please confirm we should only include PED-4 and Sealer-6 as noted in detail 4/A2.60 for Level 4 in our base bid. Also, detail 4/A2.60 highlights the roof and ramp area yellow while the legend shows TRAF-1 as red. Please clarify if the alternate is for TRAF-1 or TRAF-5B (yellow). - Aug 11 2022 at 4:17 PMCity of Mount Vernon
Base Bid for Level 4 is TRAF-5B where shown on 4/A2.60, plus the areas shown as PED-4 and SEALER-6. Base Bid for Level 4 Ramp is TRAF-5A as shown on 4/A2.60 and 3/A2.60. Alternate for Level 4 is TRAF-1 where hatch color is yellow on 7/A2.60. Areas of PED-4 and SEALER-6 remain as per Base Bid. Alternate for Level 4 Ramp is TRAF-1 in lieu of TRAF-5A.
113. Instructions to Bidders Aug 11 2022 at 2:04 PM
- Anonymous Aug 11 2022 at 2:04 PMUser information is private
Section 00 21 13 - 1 Instructions to Bidders states "the proposal form includes the following parts" and lists items a. through g. However item e. Performance Bond and Payment Bond typically wouldn't be included with the bid submittal, it would be required by the low bidder after acceptance and contract issue. Please clarify? - Aug 11 2022 at 2:31 PMCity of Mount Vernon
This was addressed in Addendum 2. Please see the Specifications revision section for revisions to Instructions to Bidders.
114. Division 14 Elevator Aug 11 2022 at 2:24 PM
- Anonymous Aug 11 2022 at 2:24 PMUser information is private
Will the owner accept an electric traction elevator in lieu of hydraulic. Kone does not have a hydraulic Elevator and would like to bid. Additional data sent by email. - Aug 12 2022 at 9:32 AMCity of Mount Vernon
This Substitution Request was not accepted.
115. 05 50 00 - Metal Fabrications (Addendum #3) Aug 11 2022 at 3:25 PM
- Anonymous Aug 11 2022 at 3:25 PMUser information is private
05 50 00 Metal Fabrications section 2.22 lists steel plate panels as 3/8". Steel plate panels shown on A2.62 are noted as 1/4". Please clarify design intent for panel thickness. - Aug 12 2022 at 3:03 PMCity of Mount Vernon
This will be addressed in a forthcoming Addendum.
116. Water Feature & Stone w/Quote Aug 11 2022 at 3:01 PM
- Anonymous Aug 11 2022 at 3:01 PMUser information is private
What spec section is the water feature & stone w/quote covered under? is the plate steel to be coreten? - Aug 15 2022 at 4:45 PMCity of Mount Vernon
The plate steel is specified in Section 05 50 00 Metal Fabrications. A new specification section, 04 40 00 STONE MATERIALS, will be issued as part of Addendum 5.
117. Civil CAD Files Aug 11 2022 at 3:47 PM
- Anonymous Aug 11 2022 at 3:47 PMUser information is private
The civil CAD files that were provided for download do not have the existing grade or new finish grade info. This information is required to generate an earthwork cut/fill estimate. Please post the civil cad files with existing grade and new finish grade information included. - Aug 12 2022 at 9:32 AMCity of Mount Vernon
This question will be responded to with a forthcoming Notice.
118. SPD Evaluation Aug 12 2022 at 9:04 AM
- Anonymous Aug 12 2022 at 9:04 AMUser information is private
We submitted a prior approval package for the SPD to allow SQD to bid that portion of the project. We also submitted a question (#49) as per instructions. We were rejected for performance issues, but the written specifications had outdated information and no clear performance criteria to compare. Can we please receive a report showing the differences so we can evaluate which of our products would be best suited for the application? - Aug 12 2022 at 3:26 PMCity of Mount Vernon
Per the Instructions to Bidders, Paragraph 3, the last opportunity to ask questions was Thursday, August 11, 2022 at 5:00 PM. As such, this question will not be answered.
119. Temporary Road Patching Aug 12 2022 at 10:32 AM
- Anonymous Aug 12 2022 at 10:32 AMUser information is private
We are assuming that we'll need to provide a temporary patch where utilities are installed in Kincaid and 2nd. Can we use cold mix as a temporary patch material. After utilities are installed in the alley most of the existing asphalt there will have been demoed. Do we need to provide a temporary patch in this area or can we leave the alley gravel till it is paved? - Aug 12 2022 at 11:26 AMCity of Mount Vernon
Per the Instructions to Bidders, Paragraph 3, the deadline for asking questions was Thursday, August 11, 2022 at 5:00 PM. As such, this question will not be answered.
120. Updated Communication Cabling Alternates Aug 12 2022 at 10:42 AM
- Anonymous Aug 12 2022 at 10:42 AMUser information is private
Specification section: 27 15 00 Paragraphs: 2.1, C. An updated substitution request with a more available Superior Essex cable was submitted via email on 8/11. Please confirm the new cable is acceptable to the owner. - Aug 12 2022 at 3:26 PMCity of Mount Vernon
If the Substitution Request was submitted in full prior to the deadline, it will be addressed in a forthcoming Addenda.
121. Bid Date Extension Aug 15 2022 at 6:32 AM
- Anonymous Aug 15 2022 at 6:32 AMUser information is private
With Addendum #4 issued Friday evening and the current bid date of 8/18/22, does not allow the proper amount of time to provide an accurate bid. Can the bid date be extended to 8/25/22? Please advise. - Aug 15 2022 at 12:16 PMCity of Mount Vernon
Per the Instructions to Bidders, Paragraph 3, the deadline for asking questions was Thursday, August 11, 2022 at 5:00 PM. As such, this question will not be answered. Bid Date has not changed.
122. Connectrac Flex Wiring System Aug 15 2022 at 6:40 AM
- Anonymous Aug 15 2022 at 6:40 AMUser information is private
Flagged Note 6 on Addendum #4,Drawing E2.12, directs to provide the Connectrac Flex Wiring system. The flag note location is pointing to the dashed line around room 110 & 114. Is this dashed line the Connectrac Flex Wiring system? - Aug 15 2022 at 12:03 PMCity of Mount Vernon
Per the Instructions to Bidders, Paragraph 3, the deadline for asking questions was Thursday, August 11, 2022 at 5:00 PM. As such, this question will not be answered.
123. Detail for Connectrac Wiring System Aug 15 2022 at 6:43 AM
- Anonymous Aug 15 2022 at 6:43 AMUser information is private
There is no detail showing how the Connectrac Wiring System routes up the wall and the book shelving. Please provide a detail showing the intended installation of the system. - Aug 15 2022 at 12:03 PMCity of Mount Vernon
Per the Instructions to Bidders, Paragraph 3, the deadline for asking questions was Thursday, August 11, 2022 at 5:00 PM. As such, this question will not be answered.
124. Traffic Coating and Concrete Finishes - REVISED RESPONSE TO QUESTION #48 Aug 15 2022 at 1:21 PM
- Aug 15 2022 at 1:21 PMCity of Mount Vernon
Spec Section 07 14 16 (3.11A) Calls for Flood Testing at all completed membrane and flashing systems. Is it acceptable to replace this flood test with ELD (Electronic Leak Detection) testing? - Aug 15 2022 at 1:23 PMCity of Mount Vernon
Please see Addendum 3 for revisions to this paragraph in the Specification Section 07 14 16 Cold Fluid-Applied Waterproofing. This response supersedes the response to Question #48.
125. Structed cabling Raceway Aug 15 2022 at 2:44 PM
- Anonymous Aug 15 2022 at 2:44 PMUser information is private
As per Addendum #4, cable tray and conduit pathway are added with the note 'typical conduit runs to cable tray'. Is this intended to mean that every device in to have conduit from the cable tray, or that the 'typical' phrase indicated a size of raceway just from locations shown? There is a large cost delta associated with these 2 intents. - Aug 15 2022 at 2:55 PMCity of Mount Vernon
Per the Instructions to Bidders, Paragraph 3, the deadline for asking questions was Thursday, August 11, 2022 at 5:00 PM. As such, this question will not be answered.
126. Water Repellants (Masonry) - REVISED RESPONSE TO QUESTION #109 Aug 15 2022 at 3:41 PM
- Aug 15 2022 at 3:41 PMCity of Mount Vernon
Specification 07 19 00 section 3.3 says to apply water repellents to “all masonry surfaces within 20 feet of grade”. Does this include the masonry surfaces exposed to the interior of the parking garage levels at the upper levels beyond 20 feet from grade? - Aug 15 2022 at 3:41 PMCity of Mount Vernon
Please see Addendum 4 for revisions to specification Section 07 19 00. Note that the revisions issued via Addendum 4 supersede the response to Question #109.