(BID) Resurfacing of Various County Roads
Last updated by Addendum #2 on Apr 10, 2025 8:06 PMSee what changed
SPLOST
74521, 75091, 91276, 91396, 96154... show all
Project ID: 25-60
Release Date: Wednesday, March 19, 2025
· Due Date: Wednesday, April 16, 2025 3:00pm
Posted Wednesday, March 19, 2025 10:00am
All dates & times in Eastern Time
Question & Answer
Questions and clarifications about the project
1. Pavement Marking Breakdown-From Sub Mar 24 2025 at 8:21 AM
- Anonymous Mar 24 2025 at 8:21 AMUser information is private
Can you please provide a breakdown of which roads will receive thermoplastic longline, 5” paint longline, 6” paint longline? - Apr 8 2025 at 5:32 PMHenry County
Item number 652-5451 and 652-6501 will be removed.
2. 8" Thermo Striping-From Sub Mar 24 2025 at 8:22 AM
- Anonymous Mar 24 2025 at 8:22 AMUser information is private
There are two pay items for 8” thermoplastic striping. What is the intended purpose for the separate items? - Apr 8 2025 at 5:32 PMHenry County
line item 0110 & 0120 will be combined as 20,750 LF.
3. Begin and End Limits Keys Ferry Rd & Kelleytown Rd Mar 28 2025 at 10:23 AM
- Anonymous Mar 28 2025 at 10:23 AMUser information is private
Can you please provide the begin and end limits for Keys Ferry Rd, Kelleytown Rd? - Apr 8 2025 at 5:32 PMHenry County
Keys Ferry Road Low Range: 1 High Range 2102 Postal City McDonough zip code: 30252 Keys Ferry Road Low Range: 2285 High Range: 2410 Postal City Jackson zip code 30233 Kelleytown Road Low Range: 109 High Range 1482 Postal City McDonough Kelleytown Road Low Range: 1522 High Range: 2945 Postal City McDonough
4. FDR Limits for Each Road Mar 28 2025 at 10:28 AM
- Anonymous Mar 28 2025 at 10:28 AMUser information is private
Will the FDR Scope be limited to just the travel lanes, or do you expect to FDR turn lanes and Side Road Turnouts? - Apr 8 2025 at 5:32 PMHenry County
FDR is typically required only for the mainline travel lanes. However, in some situations, we will use the FDR process for turn lanes and side roads if the existing conditions are not suitable for milling.
5. Paving into Side Roads Mar 28 2025 at 10:29 AM
- Anonymous Mar 28 2025 at 10:29 AMUser information is private
Could you please detail how far you want to pave into adjoining Side Roads? Will this be simply paving or mill and paving. We need to know the expectations you want the Contractor to meet. - Apr 8 2025 at 5:32 PMHenry County
Typically, the side roads are tied in back to a length of 30 feet. Side roads can usually be milled and overlaid; this can vary upon the existing conditions of each side road.
6. Paving into Adjacent Driveways Mar 28 2025 at 10:30 AM
- Anonymous Mar 28 2025 at 10:30 AMUser information is private
How far do you want to paving into adjacent Driveways? - Apr 8 2025 at 5:32 PMHenry County
Driveways shall be paved back to a variable distance to create a smooth transition for ingress and egress. This distance shall not exceed the limits of the right of way.
7. Patching Widths Mar 28 2025 at 10:32 AM
- Anonymous Mar 28 2025 at 10:32 AMUser information is private
Will the Patching areas be at least the width of a half lane milling machine? - Apr 8 2025 at 5:32 PMHenry County
Yes.
8. Night Work Mar 28 2025 at 10:34 AM
- Anonymous Mar 28 2025 at 10:34 AMUser information is private
Will Night Work be allowed? The current work hours (lane closure hours) are limited to 9am-3pm which will mean poor production and expensive work. We need to know this prior to bid submission to give the County the best prices. - Apr 8 2025 at 5:32 PMHenry County
Night work will not be permitted in areas that are highly residential due to noise impacts. Night work may be permissible on mainline roads, contingent upon the proximity to residential neighborhoods.
9. Road Details Mar 28 2025 at 10:35 AM
- Anonymous Mar 28 2025 at 10:35 AMUser information is private
Could you please provide the detail information you have for each of the roads, including lengths, widths, depth, and proposed quantities? This will help you to get better bids from all Contractors. - Apr 8 2025 at 5:32 PMHenry County
We will submit the roads, lengths, widths, and scope of work for each road. Hudson Bridge Road, Eagle's Landing Parkway and East Lake Road are all essentially one consecutive section of roadway with changing road names. Therefore, they were all quantified together. For the purpose of providing responses in a timely manner, the roads have not been split into separate quantities.
10. Prime & Sand Mar 28 2025 at 10:58 AM
- Anonymous Mar 28 2025 at 10:58 AMUser information is private
We have never seen Prime Coat paid for by the Ton, are you sure this is the correct Unit of Measure? Typically this is paid for by the Gallon. - Apr 8 2025 at 5:32 PMHenry County
Gallon is the correct unit for this pay item. The pricing table was modified to reflect this.
11. Width For Patching Mar 28 2025 at 10:58 AM
- Anonymous Mar 28 2025 at 10:58 AMUser information is private
What is the anticipated Width for the Patching? - Apr 8 2025 at 5:32 PMHenry County
The widths could vary; typically, the patches are the width of an entire lane.
12. Patching for Each Road Mar 28 2025 at 10:59 AM
- Anonymous Mar 28 2025 at 10:59 AMUser information is private
Could you provide the anticipated tons of patching for each road? - Apr 8 2025 at 5:32 PMHenry County
Patching quantities have been added to the contract to be utilized in circumstances as directed by Henry County. No specific quantities have been determined for each road.
13. Mill & Resurface Roads Mar 28 2025 at 11:03 AM
- Anonymous Mar 28 2025 at 11:03 AMUser information is private
Is it your intent to mill the road, then patch it, then resurface it? If so, how many days will be allowed between the Milling and Final Surface Placement? FYI, this "sequence of operation" (mill/patch/resurface) cannot be done all on the same day, without costing a fortune. Ideally, there needs to be 7 day between the Milling and Final Surface Placement. - Apr 8 2025 at 5:32 PMHenry County
For roads that require milling, the milling operations shall be completed first. Deep patching after milling will only be required as needed at the discretion of Henry County. Seven days is the maximum number of days that will be permitted for a milled surface prior to the placement of asphalt.
14. Paving after FDR Mar 28 2025 at 11:04 AM
- Anonymous Mar 28 2025 at 11:04 AMUser information is private
How many days do you want the FDR to Cure before the placement on Asphalt? - Apr 8 2025 at 5:32 PMHenry County
The Cement Base must attain a PSI (pounds per square inch) of 300 prior to subsequent asphalt placement. This time period is typically 3 to 7 days.
15. Questions Mar 28 2025 at 11:06 AM
- Anonymous Mar 28 2025 at 11:06 AMUser information is private
Would it be possible for you to address the question before the Question Deadline so that we have time to submit follow up questions to responses? Typically, this is needed. - Apr 8 2025 at 5:32 PMHenry County
No.
16. Location Map for Each Road Mar 28 2025 at 2:09 PM
- Anonymous Mar 28 2025 at 2:09 PMUser information is private
Would it be possible to get a location map for each road? The roads seem to change names a lot and its difficult to find the exact limits of work for each road. - Apr 8 2025 at 5:32 PMHenry County
We will not provide a map for each road. We will provide beginning and end descriptions along with road lengths and area measurements.
17. 12.5mm Polymer Mar 29 2025 at 5:40 PM
- Anonymous Mar 29 2025 at 5:40 PMUser information is private
Are you sure you don't want to use 12.5mm Polymer on Eagles Landing Pkwy and Hudson Bridge Rd, both have very large ADT Counts that would typically require these to be 12.5mm Polymer by GDOT? - Apr 8 2025 at 5:32 PMHenry County
We will add a pay item for Item 402-4510 - Recycled Asphalt Concrete 12.5 MM, Superpave, GP 2 Only, including Polymer Modified Bituminous Material and H Lime.
18. Mill & Resurface Roads Mar 29 2025 at 5:44 PM
- Anonymous Mar 29 2025 at 5:44 PMUser information is private
For the Mill and Resurface Roads, how many days will be allowed between the Milling Operations and the Placement of the Final Surface? - Apr 8 2025 at 5:32 PMHenry County
Seven days shall be the maximum number of days that will be permitted for a milled surface prior to placement of asphalt.
19. Mill & Resurface Roads Mar 29 2025 at 5:45 PM
- Anonymous Mar 29 2025 at 5:45 PMUser information is private
For the Mill and Resurface Roads if you intend to Mill and Inlay on the Same Day then our assumption is that the Patching work will be done prior to the Mill and Resurface Operations, like GDOT does on projects like this? - Apr 8 2025 at 5:32 PMHenry County
For roads that require milling, the milling operations shall be completed first. Deep patching after milling will only be required as needed at the discretion of Henry County. Seven days is the maximum number of days that will be permitted for a milled surface prior to the placement of asphalt.
20. Mill & Resurface Roads Mar 29 2025 at 5:47 PM
- Anonymous Mar 29 2025 at 5:47 PMUser information is private
For the mill and resurface roads, do you intend for the Contractor to pave back into adjacent Side Road like GDOT does? If so then will you please provide this construction detail? - Apr 8 2025 at 5:32 PMHenry County
Typically, the side roads are tied in back to a length of 30 feet. Side roads can usually be milled and overlaid; this can vary upon the existing conditions of each side road. There will be no construction detail provided for this work.
21. Work Zone Law Enforcement Mar 29 2025 at 5:50 PM
- Anonymous Mar 29 2025 at 5:50 PMUser information is private
Would you consider adding a bid item for Work Zone Law Enforcement (per Hour) especially on the Mill and Resurface Roads? The goal is to create a safe work zone for all and a pay item allow for fairness and equality amongst all bidders. - Apr 8 2025 at 5:32 PMHenry County
No. Employing the services of law enforcement, if required, will be inclusive in the overall lump sum bid for Traffic Control.
22. DBE Goal Mar 29 2025 at 5:52 PM
- Anonymous Mar 29 2025 at 5:52 PMUser information is private
The DBE Goal 11 Percent is extremely high for a paving project like this one. Typically GDOT will have a DBE Goal of 7 Percent on this kind of paving work. Would you please consider a 7 percent DBE Goal? - Apr 8 2025 at 5:32 PMHenry County
Not at this time.
23. DBE Goal Mar 29 2025 at 5:53 PM
- Anonymous Mar 29 2025 at 5:53 PMUser information is private
Are we to use GDOT Certified DBE Subs/Suppliers to meet the Goal? Or does Henry Co have a different list to utilize? - Apr 8 2025 at 5:32 PMHenry County
Yes, you are to utilize GDOT certified DBE Subs/Suppliers to meet the goal.
24. Quality Control Testing Mar 29 2025 at 6:08 PM
- Anonymous Mar 29 2025 at 6:08 PMUser information is private
Who is hiring and paying for the Quality Control Testing and Inspections in the Field? We understand the contractor must provide Material Testing at the Plant as a part of their bid. - Apr 8 2025 at 5:32 PMHenry County
Henry County will provide a contractor to conduct the Quality Control for this project.
25. Grading for Shoulders Mar 29 2025 at 6:10 PM
- Anonymous Mar 29 2025 at 6:10 PMUser information is private
Bid Item Grading, Adjust Shoulders to Grade - 16.0 LM, is this 16.0 Centerline Miles or 16.0 Individual Shoulder Miles? - Apr 8 2025 at 5:32 PMHenry County
Centerline Miles
26. Grading for Shoulders Mar 29 2025 at 6:12 PM
- Anonymous Mar 29 2025 at 6:12 PMUser information is private
Which Roads will get the Grading, Adjust Shoulder to Grade? - Apr 8 2025 at 5:32 PMHenry County
Adjust shoulder to grade will be required on the following roads in sections where there is no existing curb and gutter: Keys Ferry Road, Flippen Road, and Kelleytown Road.
27. SVDBE Subs/Suppliers Mar 29 2025 at 6:15 PM
- Anonymous Mar 29 2025 at 6:15 PMUser information is private
Will SVDBE Subs/Suppliers be allowed to be used to meet the DBE Goal? (SVDBE = Small & Veteran-Owned Businesses) If SVDBE's are allowed what percentage of the overall goal can they be used for? - Apr 8 2025 at 5:32 PMHenry County
Yes, as long as they are GDOT certified. If necessary, they can be used to meet the entire goal.
28. Pre-Bid Meeting Mar 29 2025 at 6:17 PM
- Anonymous Mar 29 2025 at 6:17 PMUser information is private
Have you considered having a Pre-Bid Meeting for this project so the County can discuss and convey the intent of the work scope to bidders and allow for open communication with bidders to get the best bid prices? This will benefit the taxpayers of Henry Co. - Apr 8 2025 at 5:32 PMHenry County
There will be no pre-bid meeting. All questions or concerns prior to the bid shall be submitted through the Purchasing Department. All bidders will be provided with the responses for fairness in the bidding process.
29. Prime Coat Unit Apr 2 2025 at 9:26 AM
- Anonymous Apr 2 2025 at 9:26 AMUser information is private
The current unit on the bid form for the Prime Coat item is by the Ton. Can the county please change this to by the Gallon? - Apr 8 2025 at 5:32 PMHenry County
Gallon is the correct unit for this pay item. The pricing table was modified to reflect this.
30. FDR Testing Apr 2 2025 at 9:27 AM
- Anonymous Apr 2 2025 at 9:27 AMUser information is private
Is the County responsible for supplying the required FDR testing or will the contractor need to include these costs into their bid? - Apr 8 2025 at 5:32 PMHenry County
Henry County will provide a contractor to conduct the Quality Control for this project.
31. FDR Mix Design Apr 2 2025 at 9:28 AM
- Anonymous Apr 2 2025 at 9:28 AMUser information is private
Is the County responsible for supplying the FDR mix design on this project or will the contractor need to include these costs into their bid? - Apr 8 2025 at 5:32 PMHenry County
Henry County will consult the services of a contractor to provide the mix designs.
32. No subject Apr 2 2025 at 11:48 AM
- Anonymous Apr 2 2025 at 11:48 AMUser information is private
Will Henry County Water Authority lower, raise, and adjust to grade any manholes and/or water valves in conflict with FDR? If not, will a pay item be added? - Apr 8 2025 at 5:32 PMHenry County
Yes. The awarded contractor shall provide a timeline consisting of a schedule of mobilization for roads so that we can coordinate with HCWA to have the manholes and valves adjusted.
33. No subject Apr 2 2025 at 11:49 AM
- Anonymous Apr 2 2025 at 11:49 AMUser information is private
Will any milling for FDR be paid for separately or is it considered incidental to FDR? - Apr 8 2025 at 5:32 PMHenry County
The pulverizing of the existing road for purposes of FDR will be included in the bid item for "Cement Stabilized Base". Any additional milling, such as haul off required for roads with curb and gutter, will be paid separately.
34. No subject Apr 2 2025 at 11:49 AM
- Anonymous Apr 2 2025 at 11:49 AMUser information is private
Will Grading Adjust shoulder to grade be paid by the Center Line Mile or Lane Mile? - Apr 8 2025 at 5:32 PMHenry County
Centerline Miles
35. No subject Apr 2 2025 at 11:49 AM
- Anonymous Apr 2 2025 at 11:49 AMUser information is private
Should the contractor include removal and restriping of the concrete bridge decks within the project limits? If so thermoplastic striping will not adhere to the concrete. Will the county consider adding additional preformed thermoplastic pavement markings to cover stop bars, arrows, solid etc…? - Apr 8 2025 at 5:32 PMHenry County
Yes, existing striping on the bridges will need to be eradicated and included in the overall bid price for traffic control. Quantity revisions will be made for the additional preformed striping items.
36. No subject Apr 2 2025 at 11:49 AM
- Anonymous Apr 2 2025 at 11:49 AMUser information is private
Will the county require post-mounted advanced warning signs? - Apr 8 2025 at 5:32 PMHenry County
Yes. The contractor shall place post mounted advanced warning signs prior to construction and maintain them until project is complete. Temporary warning signage will need to be added as required by the scope of work.
37. No subject Apr 2 2025 at 11:50 AM
- Anonymous Apr 2 2025 at 11:50 AMUser information is private
How far will the contractor be required to mix/mill/pave back at the side roads? - Apr 8 2025 at 5:32 PMHenry County
Typically, the side roads are tied in back to a length of 30 feet. Side roads can usually be milled and overlaid; this can vary upon the existing conditions of each side road.
38. No subject Apr 2 2025 at 11:50 AM
- Anonymous Apr 2 2025 at 11:50 AMUser information is private
How far will the contractor be required to mix/mill/pave back at driveways? - Apr 8 2025 at 5:32 PMHenry County
Typically, the side roads are tied in back to a length of 30 feet. Side roads can usually be milled and overlaid; this can vary upon the existing conditions of each side road.
39. No subject Apr 2 2025 at 11:50 AM
- Anonymous Apr 2 2025 at 11:50 AMUser information is private
Will the County consider extending daytime working hours to 8:30 to 4:30? - Apr 8 2025 at 5:32 PMHenry County
No.
40. No subject Apr 2 2025 at 11:50 AM
- Anonymous Apr 2 2025 at 11:50 AMUser information is private
Will the County add a pay item for mixed grade fertilizer - Apr 8 2025 at 5:32 PMHenry County
Yes.
41. No subject Apr 2 2025 at 11:50 AM
- Anonymous Apr 2 2025 at 11:50 AMUser information is private
Can the County supply any coring or Geotech reports for the FDR roads? - Apr 8 2025 at 5:32 PMHenry County
Yes. Henry County will utilize a consultant to provide reports for existing road conditions to establish the mix designs.
42. No subject Apr 2 2025 at 11:51 AM
- Anonymous Apr 2 2025 at 11:51 AMUser information is private
Can the county clarify whether pay item 412-1000 Bitum Prime Coat Inc. Sand will be paid for by the ton or gallon? Prime is typically measured by the gallon and sand the ton. - Apr 8 2025 at 5:32 PMHenry County
Gallon is the correct unit for this pay item. The pricing table was modified to reflect this.