Chestnut Street Multimodal Station
Addenda & Official Notices
Addendum #1Mar 9, 2023 2:00 PM
A date has been added to the timeline for responses to all questions. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2Mar 16, 2023 7:26 PM
BCRTA has updated the timeline to extend the bid due date two weeks, and to adjust other due dates as well. BCRTA has also added a 2nd pre-bid meeting to the timeline. Please use the See What Changed link to view the details of all the changes made by this addendum. Thanks!
Addendum #3Mar 27, 2023 5:14 PM
Please see the attached documents which provide responses to many questions posed in the Question & Answer section. All the questions answered by these documents will state "refer to Addendum #3" in their response.
Addendum #4Mar 29, 2023 5:40 PM
Vendor Submission Item 1.4 submission question type was changed to File Upload, instead of confirmation (check the See What Changed link to view in detail).
Addendum #5Apr 11, 2023 11:31 PM
Please see the attached documents and narrative which constitute the 5th and final addendum to this solicitation. Any updates to the specifications were provided in separate documents that were uploaded to the Project Documents, "ATTACHMENTS", Attachments "Q"-"BB".
Official Notice #1: Location of Drawings and Other Design DocumentsMar 8, 2023 2:39 PM
We have received several general inquiries asking for access to the design drawings. Please note that all terms and conditions (federal and university), construction terms and conditions, and design drawings can be found in the Attachments section of this website (go here:https://procurement.opengov.com/portal/butlercountyrta/projects/38218?section=313575 ). They are all in PDF form and can be downloaded from the website for review by any interested party.
Please also note that all questions should be entered in the Question and Answer section of this site, as well. Thanks all!
Official Notice #2: Bidder's Conference PresentationMar 14, 2023 6:43 PM
Official Notice #3: Pre-Bid Sign-In SheetMar 15, 2023 5:24 PM
Official Notice #4: Clarification on Attendance at First Pre-Bid MeetingMar 16, 2023 7:31 PM
Please be advised that attendance at the Pre-Bid Meeting held on March 14th, 2023 was NOT mandatory, contrary to the language in the newspaper advertisement. Attendance at all pre-bid meetings, including the second scheduled for March 28th, 2023, is voluntary and these meetings are designed to be informational.
Official Notice #5: 2nd Bidder's Conference PresentationMar 28, 2023 2:03 PM
Please see the meeting recording and attendance sheet for the 2nd bidder's conference which was held via Teams on March 28th, 2023 at 9:30 AM.
Official Notice #6: Prevailing WageApr 3, 2023 5:51 PM
Official Notice #7: Asbestos Survey and Universal Waste InventoryApr 4, 2023 2:01 PM
Per the attached survey and inventory, the Maintenance Garage Building, 101 W. Chestnut Street, is able to be demolished as part of this project. Westech report dated April 3rd, 2023 determines no asbestos was found in the building Maintenance Garage Building. This information will also be included in forthcoming addenda.